PROJECTS

Semiconductor Fab Construction

87 fab, advanced-packaging, and supplier builds across the U.S. and key global hubs — by region, status, and developer. We track every major project here; and specialize in helping owners and construction management teams recruit the cleanroom, UPW, and controls crews who deliver them.

Hire Top Talent
Explore Jobs
Last updated: Q2 2026 · compiled from public filings, CHIPS Act disclosures, company announcements, and trade publications.
87
Major semiconductor construction projects tracked across the U.S., Europe, and Asia-Pacific.
$500B+
Aggregate disclosed capital investment across fabs, advanced packaging, and materials buildouts in the post-CHIPS Act cycle.
6 project types
Logic fabs, memory fabs, foundries, advanced packaging, materials & gases, equipment manufacturing.
25+ companies
Intel, TSMC, Samsung, Micron, GlobalFoundries, Texas Instruments, SK Hynix, Wolfspeed, onsemi, Bosch and more.
20+ markets
Arizona, Ohio, Texas, New York, Oregon, Idaho, plus Germany, Ireland, Israel, Japan, Korea, Taiwan.
Browse

Browse by region

Use the navigation below to jump directly to the regional section you want. Each section is organized by status and project type.

Featured Spotlights

The marquee builds shaping the post-CHIPS Act semiconductor cycle

Five projects whose scale, complexity, and CHIPS Act anchor positioning mark them as defining builds for the 2024–2030 U.S. and global semiconductor construction cycle.

Spotlight 01 · Under Construction

TSMC — Arizona Fab 21 (Phoenix)

Taiwan Semiconductor Manufacturing Company · Phoenix, AZ · 3-fab campus, phased delivery

TSMC’s largest single overseas investment in company history. The Phoenix Fab 21 campus comprises three leading-edge logic fabs (N4/N3/N2 nodes) supporting customers including Apple, NVIDIA, AMD, and Qualcomm. Fab 1 began production in Q1 2025; Fab 2 and Fab 3 are in active construction with sequenced 2027–2030 ramps.

$65B+ Total committed across 3 fabs
3 fabs Phased delivery
N4 / N3 / N2 Leading-edge nodes
Spotlight 02 · Under Construction

Samsung — Taylor Texas Fab

Samsung Foundry · Taylor, TX · Phase 1 progressing

Samsung’s largest single U.S. investment. Initial fab supports advanced foundry capacity at sub-5nm nodes. Phase 2 fab announced for the same campus, with combined commitment now exceeding $44B.

$44B+ Phase 1 + 2 commitment
2 fabs Planned
Sub-5nm Advanced foundry
Spotlight 03 · Under Construction

Intel — Ohio One (New Albany / Licking County)

Intel · Licking County, OH · "Silicon Heartland" anchor

Intel’s anchor U.S. CHIPS Act buildout and the centerpiece of the "Silicon Heartland" initiative. Initial two fabs support Intel’s 18A and next-generation logic processes. Master plan supports expansion to eight fabs.

$28B+ Phase 1 (2 fabs)
1,000 acres Campus
Up to 8 fabs Master plan
Spotlight 04 · Under Construction

Micron — Clay NY (Syracuse Megafab)

Micron Technology · Clay, NY (Onondaga County)

One of the largest single semiconductor investments ever announced. Micron’s Central New York memory megafab campus targets four fabs over 20 years supporting DRAM production. First fab in early construction phase.

$100B 20-year commitment
4 fabs Master plan
DRAM Memory focus
Spotlight 05 · Under Construction

Texas Instruments — Sherman TX (LFAB2 + LFAB3 + LFAB4)

Texas Instruments · Sherman, TX (Grayson County)

One of TI’s largest U.S. capital programs. The Sherman campus comprises four 300mm analog and embedded processor fabs (LFAB1 already operational; LFAB2–4 in phased delivery through 2030).

$30B+ Multi-fab commitment
4 fabs Phased delivery
300mm analog Embedded processors
The Tracker

87 active semiconductor construction projects

Organized by region. We track every project below; on select builds we’re actively recruiting senior PM, superintendent, MEP, commissioning, controls (BMS / Niagara), ultra-pure water, gas systems, and cleanroom-experienced roles.

Arizona Megasite Cluster 7 projects
Under ConstructionLogic Fab

TSMC — Arizona Fab 21 Phase 2 (N3)

TSMC · Phoenix, AZ
~$20BN3 node2027+

Second of three TSMC Arizona fabs targeting N3 leading-edge logic for U.S.-customer wafer production.

PCL / Sundt / LaytonHiring for this build? →
Under ConstructionLogic Fab

TSMC — Arizona Fab 21 Phase 3 (N2)

TSMC · Phoenix, AZ
~$25BN2 node2028+

Third TSMC Arizona fab targeting N2 leading-edge logic. Anchors the long-term U.S. advanced node roadmap.

PCL / Sundt / LaytonHiring for this build? →
Recently OpenedLogic Fab

TSMC — Arizona Fab 21 Phase 1 (N4)

TSMC · Phoenix, AZ
~$20BN4 nodeProduction 2025

First TSMC Arizona fab in production as of Q1 2025. Initial U.S.-made leading-edge logic for customers including Apple and AMD.

PCL / Sundt / LaytonHiring for this build? →
Under ConstructionLogic Fab

Intel — Fab 52 (Chandler, AZ)

Intel · Chandler, AZ (Ocotillo campus)
~$20B18A node2025+ ramp

Intel’s newest Arizona fab supporting the 18A process node and next-generation client and server logic.

Hensel Phelps / LaytonHiring for this build? →
Under ConstructionLogic Fab

Intel — Fab 62 (Chandler, AZ)

Intel · Chandler, AZ (Ocotillo campus)
~$15BAdvanced nodePhased

Intel’s second new Arizona fab on the Ocotillo campus supporting advanced node capacity.

Hensel Phelps / LaytonHiring for this build? →
Under ConstructionAdvanced Packaging

TSMC — Arizona Advanced Packaging Facility

TSMC · Phoenix, AZ
~$1B+CoWoS / SoICMulti-phase

TSMC’s U.S. advanced packaging facility supporting CoWoS and 3D integration for AI accelerator customers.

Operational + ExpansionMaterials

Sumitomo / Air Liquide / Linde — Phoenix Gas & Chemical Plants

Multiple suppliers · Phoenix MSA, AZ
Multi-siteGas + ChemicalSupplier cluster

Cluster of materials, gas, and chemical supplier plants supporting TSMC and Intel Arizona fab operations.

Ohio & Silicon Heartland 5 projects
Under ConstructionLogic Fab

Intel — Ohio One Fab 1 (Mod 1)

Intel · New Albany / Licking County, OH
~$14B18A / next-gen2026–2027 ramp

First fab of Intel’s Ohio One mega campus supporting 18A and next-generation logic processes.

Gilbane / Turner / Hensel PhelpsHiring for this build? →
Under ConstructionLogic Fab

Intel — Ohio One Fab 2 (Mod 2)

Intel · New Albany / Licking County, OH
~$14BAdvanced nodePhase delivery

Second Ohio One fab sequenced after Fab 1 in the Phase 1 master plan.

Gilbane / Turner / Hensel PhelpsHiring for this build? →
Design / PermittingLogic Fab

Intel — Ohio One Master Plan Expansion (Fabs 3–8)

Intel · New Albany / Licking County, OH
$100B+ master planUp to 8 fabs2030+

Master plan expansion of the Ohio One campus supporting up to eight fabs over the long horizon.

Under ConstructionAdvanced Packaging

SK Hynix — West Lafayette IN Advanced Packaging Plant

SK Hynix · West Lafayette, IN (Silicon Heartland)
$3.87BHBM packagingPhase 1

SK Hynix’s U.S. high-bandwidth memory (HBM) advanced packaging facility supporting AI accelerator integration.

Mortenson / PepperHiring for this build? →
Under ConstructionMaterials

Air Products — New Albany Industrial Gas Plant

Air Products / multiple suppliers · New Albany, OH
~$1B+Industrial gasesIntel-anchored

Industrial gas and chemicals supplier plant cluster supporting Intel Ohio One fab operations.

Texas 9 projects
Under ConstructionFoundry

Samsung — Taylor Fab Phase 1

Samsung Foundry · Taylor, TX
~$25BSub-5nm foundryPhase 1

Samsung’s flagship U.S. foundry, supporting advanced node logic for U.S. customers.

McCarthy / DPR / BeckHiring for this build? →
Design / PermittingFoundry

Samsung — Taylor Fab Phase 2

Samsung Foundry · Taylor, TX
~$19BAdvanced foundry2027+

Second Samsung Taylor fab supporting continued U.S. foundry capacity expansion.

Under ConstructionLogic Fab

Texas Instruments — LFAB2 (Sherman, TX)

Texas Instruments · Sherman, TX (Grayson County)
~$7B300mm analog2025+ ramp

TI’s second 300mm Sherman fab supporting analog and embedded processor production.

McCarthy / Manhattan / HoarHiring for this build? →
Under ConstructionLogic Fab

Texas Instruments — LFAB3 (Sherman, TX)

Texas Instruments · Sherman, TX
~$7B300mm analogPhase 3

Third TI Sherman fab in the master plan, sequenced after LFAB2.

McCarthy / Manhattan / HoarHiring for this build? →
Design / PermittingLogic Fab

Texas Instruments — LFAB4 (Sherman, TX)

Texas Instruments · Sherman, TX
~$7B300mm analog2028+

Fourth and final fab of the TI Sherman master plan.

McCarthy / Manhattan / HoarHiring for this build? →
Operational + ExpansionLogic Fab

Texas Instruments — Richardson RFAB Expansion

Texas Instruments · Richardson, TX
$3B+300mm analogPhase add

Continued expansion of TI’s Richardson 300mm fab supporting analog production capacity.

Under ConstructionLogic Fab

Infineon — Round Rock TX SiC Fab

Infineon Technologies · Round Rock, TX
~$1BSilicon CarbidePower semis

Infineon’s U.S. silicon carbide power semiconductor manufacturing site supporting EV and renewable energy power conversion.

Under ConstructionLogic Fab

X-FAB — Lubbock TX (analog mixed-signal)

X-FAB Silicon Foundries · Lubbock, TX
$200M+AnalogSpecialty

X-FAB analog mixed-signal foundry expansion supporting specialty semiconductor production.

Under ConstructionEquipment

Applied Materials — Austin Equipment Hub Expansion

Applied Materials · Austin, TX
$300M+Equipment mfgMulti-building

Applied Materials’ Austin equipment manufacturing and R&D expansion supporting semiconductor capital equipment production.

New York 7 projects
Under ConstructionMemory Fab

Micron — Clay NY Fab 1

Micron Technology · Clay, NY (Onondaga County)
$20B Phase 1DRAMMulti-million sq ft

First Micron Central New York memory fab, anchoring the company’s $100B 20-year master plan for the site.

Turner / DPR / JacobsHiring for this build? →
Design / PermittingMemory Fab

Micron — Clay NY Fabs 2–4 (Master Plan)

Micron Technology · Clay, NY
$80BDRAM20-year plan

Three additional Clay NY memory fabs in the master plan, sequenced through the 20-year horizon.

Under ConstructionFoundry

GlobalFoundries — Malta NY Fab 8 Expansion

GlobalFoundries · Malta, NY (Saratoga County)
$4.7BSpecialty foundryMulti-phase

Major expansion of the GlobalFoundries Malta Fab 8 supporting specialty mixed-signal and RF semiconductor production.

M+W / Turner / DPRHiring for this build? →
Design / PermittingFoundry

GlobalFoundries — Malta NY Fab 8.2 (announced)

GlobalFoundries · Malta, NY
~$8BAdvanced foundry2027+

Announced second GF Malta fab supporting future U.S. specialty foundry capacity.

Under ConstructionLogic Fab

Wolfspeed — Marcy NY (Mohawk Valley) SiC Fab

Wolfspeed · Marcy, NY (Mohawk Valley)
$5B+Silicon CarbidePower semis

Wolfspeed’s flagship silicon carbide power semiconductor fab supporting EV and renewable energy power conversion.

Under ConstructionMaterials

Edwards Vacuum — Genesee County NY Plant

Edwards Vacuum (Atlas Copco) · Genesee County, NY
$320MVacuum equipmentMaterials

Edwards Vacuum’s U.S. semiconductor equipment plant supporting Micron CNY and the broader Northeast fab cluster.

LeChase / Hueber-BreuerHiring for this build? →
Under ConstructionR&D / Pilot

NSTC / NY CREATES — Albany Nanotech R&D Expansion

National Semiconductor Technology Center · Albany, NY
$11B+ over decadeR&DPilot line

National Semiconductor Technology Center pilot R&D facility expansion anchored at Albany Nanotech, supporting U.S. advanced node research.

Turner / DPR / SkanskaHiring for this build? →
Northwest (Oregon, Idaho, Utah) 7 projects
Under ConstructionLogic Fab

Intel — D1X Mod 3 (Hillsboro, OR)

Intel · Hillsboro, OR (Ronler Acres)
$36B+R&D + productionAdvanced node

Major expansion of Intel’s D1X campus supporting leading-edge process development and high-volume manufacturing.

Hoffman / Hensel PhelpsHiring for this build? →
Under ConstructionMemory Fab

Micron — Boise Idaho Memory Fab

Micron Technology · Boise, ID
$15BDRAMMulti-phase

Micron’s Boise leading-edge DRAM fab expansion supporting U.S. memory production capacity adjacent to the company HQ.

Sundt / Layton / HoffmanHiring for this build? →
Under ConstructionLogic Fab

Texas Instruments — Lehi UT Expansion

Texas Instruments · Lehi, UT
$11B+300mm analogMulti-phase

TI’s Lehi 300mm fab expansion supporting analog and embedded processor production.

Under ConstructionEquipment

Lam Research — Sherwood OR Equipment Plant

Lam Research · Sherwood / Tualatin, OR
$300M+Equipment mfgMulti-building

Lam Research expansion supporting U.S. semiconductor capital equipment production.

Operational + ExpansionLogic Fab

Analog Devices — Hillsboro OR Site

Analog Devices · Hillsboro, OR
$500M+AnalogPhase add

Analog Devices’ Hillsboro fab expansion supporting U.S. analog and mixed-signal production.

Under ConstructionLogic Fab

HP Inc. / Micron-adjacent — Vancouver WA Site

Multiple semi suppliers · Vancouver, WA
Multi-siteSupplier clusterMulti-building

Pacific Northwest semiconductor supplier cluster supporting Micron and Intel operations.

Under ConstructionLogic Fab

onsemi — Pocatello ID expansion

onsemi · Pocatello, ID
~$300MSiC fabricationPhase add

onsemi’s Idaho silicon carbide power semiconductor expansion.

Northeast & Mid-Atlantic 7 projects
Under ConstructionLogic Fab

onsemi — Hudson NH SiC Fab

onsemi · Hudson, NH
$2B+Silicon CarbideEV power

onsemi’s flagship U.S. silicon carbide power semiconductor fab supporting EV and renewable energy applications.

Under ConstructionEquipment

ASML — Wilton CT US HQ Expansion

ASML · Wilton, CT
$200M+Equipment + R&DMulti-building

ASML’s U.S. headquarters expansion supporting EUV lithography service and R&D operations.

Under ConstructionMaterials

Entegris — Colorado Springs Materials Plant

Entegris · Colorado Springs, CO (note: cross-listed)
~$600MSpecialty materialsMulti-phase

Entegris’ advanced semiconductor materials plant supporting U.S. fab supply chain.

JE Dunn / MortensonHiring for this build? →
Operational + ExpansionMemory Fab

Analog Devices — Beaverton / Norwood MA

Analog Devices · Norwood, MA
$1B+AnalogHQ + R&D

Analog Devices’ Norwood headquarters and R&D campus continuing capacity additions.

Suffolk / ConsigliHiring for this build? →
Under ConstructionLogic Fab

Skywater Technology — Florida Defense Fab (relocated/expanded)

Skywater Technology · Bloomington / Indianapolis area
$1.8B+Specialty foundryDefense applications

Skywater specialty foundry expansion supporting domestic defense and aerospace semiconductor production (note: cross-listed Midwest/Northeast).

Under ConstructionEquipment

KLA Corporation — Ann Arbor MI R&D Facility (Northeast adjacency)

KLA Corporation · Ann Arbor, MI
$500M+R&D + equipmentMulti-building

KLA’s metrology and inspection equipment R&D facility supporting U.S. semiconductor capital equipment innovation.

Walbridge / SkanskaHiring for this build? →
Under ConstructionMaterials

SUMCO — New Jersey Silicon Wafer Plant

SUMCO Corporation · New Jersey
$300M+Silicon wafersMaterials

SUMCO silicon wafer manufacturing capacity expansion supporting U.S. fab supply chain.

California 6 projects
Under ConstructionLogic Fab

Bosch — Roseville CA SiC Fab

Bosch · Roseville, CA
$1.5BSilicon CarbideEV power semis

Bosch’s U.S. silicon carbide power semiconductor manufacturing site supporting EV and clean energy applications.

Under ConstructionEquipment

Applied Materials — Sunnyvale Campus Expansion

Applied Materials · Sunnyvale, CA
$4B+ multi-siteEquipment + R&DMulti-building

Applied Materials’ flagship campus expansion supporting semiconductor capital equipment R&D and manufacturing.

Under ConstructionEquipment

Lam Research — Fremont CA Equipment Plant

Lam Research · Fremont, CA
$200M+Equipment mfgMulti-building

Lam Research Fremont equipment manufacturing expansion supporting global wafer fabrication equipment supply.

Under ConstructionR&D / Pilot

NVIDIA — Santa Clara HQ Voyager Building

NVIDIA · Santa Clara, CA
~$800MR&D + OfficeEndeavor expansion

NVIDIA’s Santa Clara HQ Voyager building expansion supporting AI/GPU R&D operations.

Under ConstructionR&D / Pilot

AMD — Santa Clara HQ Expansion

AMD · Santa Clara, CA
$400M+R&D + OfficeMulti-building

AMD’s Santa Clara headquarters and R&D expansion supporting CPU/GPU and AI accelerator development.

Under ConstructionLogic Fab

Intel — Folsom CA Site Expansion

Intel · Folsom, CA
~$500MR&D + designMulti-building

Intel’s Folsom design and R&D campus expansion supporting product engineering and validation.

Southeast & Carolinas 5 projects
Under ConstructionMaterials

Wolfspeed — Siler City NC SiC Materials Plant

Wolfspeed · Siler City, NC
$5BSiC substratesMulti-phase

Wolfspeed’s silicon carbide substrate materials plant supporting global SiC power semiconductor supply chain.

Under ConstructionMaterials

Pallidus — Salem NY SiC Substrates (cross-listed)

Pallidus · multiple sites
~$700MSiC substratesMaterials

Silicon carbide substrate materials capacity expansion supporting growing SiC fab demand.

Under ConstructionMaterials

Mitsubishi Chemical — SC Materials Plant

Mitsubishi Chemical · South Carolina
$200M+Specialty chemicalsMaterials

Specialty semiconductor materials production supporting U.S. and global fab supply chain.

Under ConstructionMaterials

JSR Corporation — Sunnyvale-East / NC Photoresist Plant

JSR Corporation · multiple sites
~$300MPhotoresistMaterials

JSR photoresist manufacturing expansion supporting advanced lithography materials supply.

Under ConstructionLogic Fab

Vishay Intertechnology — Greenville NC Fab Expansion

Vishay Intertechnology · Greenville, NC
$300M+Discrete semisPhase add

Vishay’s discrete semiconductor fab expansion supporting U.S. power device production.

Other U.S. 6 projects
Under ConstructionMaterials

Hemlock Semiconductor — Saginaw MI Polysilicon Plant

Hemlock Semiconductor · Saginaw, MI
$375M+PolysiliconMulti-phase

Hemlock polysilicon manufacturing expansion supporting U.S. semiconductor and solar PV supply chain.

Under ConstructionFoundry

Polar Semiconductor — Bloomington MN Specialty Foundry

Polar Semiconductor · Bloomington, MN
$525M+200mm specialtyPhase add

Polar Semiconductor’s Minnesota specialty foundry expansion supporting analog and mixed-signal production.

Mortenson / Kraus-AndersonHiring for this build? →
Under ConstructionMaterials

Coherent — Saxonburg PA SiC Materials

Coherent Corp. · Saxonburg, PA
~$300MSiC materialsMulti-phase

Coherent’s silicon carbide substrate materials capacity expansion in Pennsylvania.

Under ConstructionMaterials

II-VI Coherent — Easton PA Specialty Materials

Coherent · Easton, PA
$200M+Specialty materialsMulti-phase

Coherent specialty semiconductor and laser materials manufacturing expansion.

Under ConstructionLogic Fab

Microchip — Colorado Springs Specialty Fab

Microchip Technology · Colorado Springs, CO
$300M+SpecialtyPhase add

Microchip’s Colorado Springs fab expansion supporting analog and embedded controller production.

JE Dunn / MortensonHiring for this build? →
Under ConstructionR&D / Pilot

National Semiconductor Technology Center — Phoenix-affiliated Pilot

NSTC · Phoenix, AZ adjacencies
Multi-billion over decadeR&DPilot lines

NSTC pilot R&D facility supporting advanced semiconductor research adjacent to TSMC and Intel Arizona operations.

Europe 14 projects
Under ConstructionLogic Fab

TSMC — Dresden Germany ESMC Fab

TSMC / ESMC JV (Bosch, NXP, Infineon) · Dresden, Germany
€10B+22/28nm specialty2027+ ramp

TSMC’s European Semiconductor Manufacturing Company joint venture fab supporting automotive and industrial semiconductor demand.

Design / PermittingLogic Fab

Intel — Magdeburg Germany Megasite

Intel · Magdeburg, Germany
€30B+Advanced nodePaused, in review

Intel’s announced flagship European mega-fab campus. Currently in extended permitting / strategic review.

Under ConstructionLogic Fab

Intel — Israel Fab 38 (Kiryat Gat)

Intel · Kiryat Gat, Israel
$25BAdvanced nodeMulti-phase

Intel’s flagship Israel Fab 38 expansion supporting global advanced node logic production.

Under ConstructionLogic Fab

Bosch — Dresden Germany Fab

Bosch · Dresden, Germany
€1B+SiC + 300mmOperational + Expand

Bosch’s Dresden semiconductor manufacturing campus including SiC and silicon production for automotive applications.

Under ConstructionLogic Fab

Infineon — Dresden Megafab

Infineon · Dresden, Germany
€5B300mm power semisMulti-phase

Infineon’s Dresden mega-fab expansion supporting power and analog semiconductor production.

Under ConstructionLogic Fab

Wolfspeed — Saarlouis Germany SiC Fab

Wolfspeed / ZF · Saarlouis, Germany
€3BSiC EV power2027+

Wolfspeed’s European silicon carbide power semiconductor fab in partnership with ZF supporting EV applications.

Under ConstructionLogic Fab

STMicroelectronics — Crolles France 300mm Expansion

STMicroelectronics / GlobalFoundries · Crolles, France
€7.5B300mmMulti-phase

ST/GlobalFoundries joint venture 300mm fab in Crolles supporting European specialty semiconductor production.

Under ConstructionLogic Fab

STMicroelectronics — Catania Italy SiC Plant

STMicroelectronics · Catania, Italy
€5BSiC integratedMulti-building

ST’s Catania silicon carbide fully-integrated manufacturing site supporting global SiC supply chain.

Under ConstructionLogic Fab

NXP / VIS — Singapore-Europe Cross-Border (Eindhoven adjacency)

NXP · Eindhoven, Netherlands
€500M+R&D + productionMulti-building

NXP’s European R&D and specialty production campus expansion.

Under ConstructionEquipment

ASML — Veldhoven Netherlands HQ Expansion

ASML · Veldhoven, Netherlands
€1B+EUV equipmentMulti-building

ASML’s flagship Veldhoven headquarters and EUV equipment production expansion.

Under ConstructionMaterials

Siltronic — Singapore-EU Wafer Capacity (Burghausen)

Siltronic · Burghausen, Germany
€500M+300mm silicon wafersMulti-phase

Siltronic 300mm silicon wafer manufacturing capacity supporting global fab supply chain.

Under ConstructionLogic Fab

X-FAB — Erfurt Germany Specialty Foundry

X-FAB Silicon Foundries · Erfurt, Germany
€500M+SpecialtyMulti-phase

X-FAB’s Erfurt specialty foundry expansion supporting analog and mixed-signal European production.

Under ConstructionR&D / Pilot

imec — Leuven Belgium R&D Expansion

imec · Leuven, Belgium
€1B+R&D + pilotMulti-building

imec’s leading-edge R&D and pilot line expansion supporting global semiconductor research collaboration.

Design / PermittingMaterials

Silex Microsystems — Järfälla Sweden MEMS Plant

Silex Microsystems · Jarfalla, Sweden
€200M+MEMS foundryMulti-phase

Silex MEMS foundry expansion supporting global sensor and microsystem device production.

Asia-Pacific 14 projects
Under ConstructionFoundry

TSMC — Hsinchu Taiwan Advanced Node Fabs

TSMC · Hsinchu, Taiwan
Multi-billion2nm pilotHQ expansion

TSMC’s flagship Hsinchu campus continued buildout supporting 2nm production and beyond.

Under ConstructionFoundry

TSMC — Kumamoto Japan Fab 1 + 2 (JASM)

TSMC / JASM JV (Sony, Denso, Toyota) · Kumamoto, Japan
$20B+22/28nm + 12/16nm2-fab JV

TSMC’s Japanese mega-fabs supporting automotive and industrial semiconductor demand in partnership with Japanese OEMs.

Under ConstructionMemory Fab

Samsung — Pyeongtaek Korea P4 + P5

Samsung Semiconductor · Pyeongtaek, South Korea
Multi-billionMemory + FoundryMulti-phase

Samsung’s flagship Korean Pyeongtaek mega-campus phases 4 and 5 supporting memory and foundry capacity expansion.

Design / PermittingLogic Fab

Samsung — Yongin Korea Mega Cluster

Samsung Semiconductor · Yongin, South Korea
$230B+5 fabs planned20-year buildout

Samsung’s announced Yongin mega cluster supporting up to five advanced semiconductor fabs over the long horizon.

Under ConstructionMemory Fab

SK Hynix — Yongin Cluster M16

SK Hynix · Yongin / Icheon, South Korea
$100B+DRAM + NANDMulti-phase

SK Hynix’s Yongin memory cluster expansion supporting DRAM and high-bandwidth memory production.

Under ConstructionMemory Fab

Micron — Hiroshima Japan Fab Expansion

Micron Technology · Hiroshima, Japan
$3.7B+EUV DRAMPhase add

Micron’s Hiroshima fab expansion supporting EUV-enabled DRAM production for global supply.

Under ConstructionMemory Fab

Micron — Taichung Taiwan Expansion

Micron Technology · Taichung, Taiwan
$3B+DRAM + advanced packagingMulti-phase

Micron’s Taichung memory and HBM advanced packaging expansion.

Under ConstructionLogic Fab

Rapidus — Hokkaido Japan 2nm Fab

Rapidus · Chitose, Hokkaido, Japan
$33B+2nm GAA2027+ ramp

Rapidus’s 2nm gate-all-around logic fab anchoring Japanese government-supported advanced semiconductor manufacturing return.

Under ConstructionMemory Fab

Kioxia & Western Digital — Yokkaichi Japan NAND

Kioxia / Western Digital JV · Yokkaichi, Japan
~$8B3D NANDMulti-phase

Kioxia/WD joint venture NAND flash production expansion supporting global storage demand.

Under ConstructionFoundry

VIS / Vanguard — Singapore 12-inch Fab

VIS / Vanguard International Semiconductor · Singapore
$7.8B12-inch specialtyMulti-fab

VIS/NXP joint venture 12-inch wafer fab in Singapore supporting analog and mixed-signal production.

Under ConstructionLogic Fab

UMC — Singapore 22/28nm Fab Expansion

UMC · Singapore
$5B22/28nmPhase add

UMC’s Singapore 22/28nm fab expansion supporting Asian specialty foundry demand.

Under ConstructionFoundry

GlobalFoundries — Singapore Fab 7P3

GlobalFoundries · Singapore (Tampines / Woodlands)
$4BSpecialty foundry300mm

GlobalFoundries Singapore expansion supporting specialty foundry demand including automotive and IoT.

Under ConstructionAdvanced Packaging

ASE Group — Kaohsiung Taiwan Advanced Packaging

ASE Technology Holding · Kaohsiung, Taiwan
$2B+CoWoS / advanced packagingMulti-phase

ASE’s Taiwan advanced packaging expansion supporting global AI accelerator integration capacity.

Under ConstructionMaterials

Resonac / Showa Denko — Japan Advanced Materials Expansion

Resonac Holdings · Multiple Japan sites
¥100B+Advanced materialsMulti-site

Resonac semiconductor materials production expansion supporting Japanese and global fab supply chain.

Methodology

How iRecruit.co tracks semiconductor construction projects

Every project shown is compiled from public filings, CHIPS Act disclosures, company announcements, regulatory disclosures, and our own placement work across the segment.

What makes a project the tracker

To appear in the tracker, a project must meet at least three of the following criteria:

Publicly confirmed semiconductor company, foundry, IDM, or supplier as sponsor.
Disclosed location at minimum to metro / municipality level.
Public size figure ($ investment, fab count, sq ft, or wafer capacity).
Confirmed project status (announced, design / permitting, under construction, or recently operational).
Sourced from public filings, CHIPS Act applications, company press releases, regulatory disclosures, or established trade publications.
Active within the 2024–2030 delivery window relevant to current semiconductor construction recruiting demand.

The tracker is maintained by iRecruit.co’s research team in coordination with our active placement work across the segment. Verify all data before referencing in formal documents. Project specifics ($ figures, fab counts, GC assignments, timelines) may have evolved — several CHIPS Act-anchored projects are subject to ongoing policy review.

Related

Semiconductor construction intelligence from iRecruit.co

If you’re researching semiconductor construction projects, you’re likely also evaluating the workforce, cleanroom and ultra-pure water expertise, and process-engineering realities that shape execution on fab builds.

Hiring talent for a fab build shown here?

iRecruit.co recruits the project managers, superintendents, MEP coordinators, controls engineers, cleanroom specialists, ultra-pure water / gas systems leads, and commissioning agents who deliver builds like these. 30-minute scoping call gets you a concrete proposal within 48 hours.