Example candidateJamal C.
- Baseline & recovery scheduler on 4 hyperscale campus builds
- DCMA 14-point compliant baselines on last 3 programs
- Fragnet-based TIA lead on 2 major delay claims (both defended)
Hire Schedulers with clean CPM logic and claim-defense-grade documentation — not just P6 fluency. Reference-verified track record of holding baseline, defending float, and preventing time impact analysis from becoming litigation.
Example candidateA structured process for scheduling hires where soft logic and lazy update discipline lose the delay-analysis argument — and hold up cash-flow certification.
30-minute call. Align on sector, delivery model, scheduling stack (P6, MS Project, Synchro), resource-loading expectations, delay-analysis exposure, and start date.
Within 2 weeks we introduce 3–5 Schedulers with delivered baseline discipline in your sector. Prior schedules reviewed for logic quality where confidentiality allows.
Every placement carries a replacement guarantee. If the hire fails within the warranty window, we run a no-fee replacement search.
A schedule is a legal instrument — it’s how you defend time, cost, and cash flow. Logic discipline, resource-loading depth, and time impact analysis fluency separate a Scheduler who holds the schedule from one who just re-baselines away the slip.
Every Scheduler on the shortlist is reference-verified on logic quality: relationship discipline, constraint hygiene, calendar rigor, and DCMA 14-point compliance where applicable. Not just “P6 fluency.”
Delivered TIA-referenced experience: fragnets, windows analysis, contemporaneous period analysis, and claim-defense-grade documentation. Verified through prior project executives and claims counsel where reachable.
Hyperscale MEP-heavy activity durations, healthcare tower phased duration, cGMP commissioning windows, semi tool fit-up sequencing. Matched to your sector — not commercial office defaults.
Every candidate is credential-verified, logic-reviewed, and matched to your sector. Anonymized examples below reflect real placement profiles.
Example candidate
Example candidate
Example candidate“Scheduler” means very different things across sectors and delivery models. Below are the specializations we recruit for:
We’ll help you scope the role on the call — delivery model, sector, delay-analysis exposure, and reporting rhythm.
Scheduling hires live and die on logic quality and TIA discipline. Below is what every candidate has documented before you meet them:
Primavera P6, MS Project, Asta Powerproject, Synchro 4D. Matched to your existing environment before finalist interviews.
PMI-SP, AACE PSP, DCMA 14-point familiarity, and sector-specific credentials as applicable. Not just software certifications.
Reference-verified from prior project executives and claims counsel where reachable. Baseline discipline, relationship hygiene, and constraint rigor.
Fragnet-based TIA, windows analysis, and contemporaneous period analysis experience. Where litigation is likely, deposition-ready experience is required and verified.
Verified resource-loaded schedule experience: labor histograms, S-curves, EVM integration where required. Not just activity-level scheduling.
Scheduler, Senior, Scheduling Manager, and Director of Project Controls comp bands aligned before finalist interviews.
Time to shortlist is typically 2 weeks from scoping call. Total time to placement (shortlist through offer acceptance) is typically 3–4 weeks.
Pricing depends on engagement model. Per-role recruiting is a defined fee. Embedded is a monthly retainer. Executive search (Director of Project Controls) is a retained fee, typically 30–35% of first-year cash comp.
Yes. Every level and adjacency — Junior Scheduler, Scheduler, Senior Scheduler, Scheduling Manager, Claims / TIA Scheduler, and Director of Project Controls.
Yes. Claims-side scheduling (fragnet TIA, windows analysis, forensic scheduling, expert-witness depositions) is core coverage. Deposition and testimony experience verified where required.
Where required. We reference-verify logic quality with prior project executives, claims counsel, and prior owners on DCMA 14-point performance and baseline discipline.
Yes. Every Scheduler placement carries a replacement guarantee. Guarantee terms are confirmed in writing at engagement start.
Yes. Multi-hire project-controls builds (Director + Sr Schedulers + Cost Engineers + Claims Specialists) route through embedded recruiting or RPO. Common for GCs standing up mission-critical verticals.
Generalist recruiters treat all P6 users as interchangeable. iRecruit.co Scheduler recruiters verify logic quality and TIA fluency — every candidate is matched to your delay-analysis exposure, not just software fluency.
30-minute scoping conversation. We’ll review the scheduling role you need, delivery model, delay-analysis exposure, and reporting rhythm — then recommend the right hire path and start sourcing.