Power & Grid Construction Project Tracker

A continuously updated directory of the major U.S. power generation, transmission, and grid construction projects driving hiring demand - from gas peakers and battery storage to HVDC corridors and substations.

Hire Top Talent
Explore Jobs
Last updated: Q3 2026 · compiled from FERC and state PSC filings, ERCOT and RTO planning documents, developer announcements, and trade publications.
16
Major U.S. power generation, transmission, and grid construction projects tracked across every load-growth region.
$50B+
Aggregate disclosed capital investment across tracked gas generation, storage, HVDC, and utility transmission programs.
3,800+ mi
Line-miles of high-voltage transmission across tracked HVDC corridors and utility backbone programs.
20+ owners
Invenergy, Pattern Energy, Oncor, AEP Texas, LCRA, NV Energy, Idaho Power, PacifiCorp, Xcel Energy, NYPA, Entergy, NRG, Calpine and more.
4 build categories
HVDC and interregional transmission, utility transmission and substations, gas generation and peakers, storage and repowering.
Browse

Browse by build category

Use the navigation below to jump directly to the section you want. Each section is organized by status, owner, and hiring-relevant scope.

Featured Spotlights

The marquee builds shaping the U.S. power buildout

Three programs whose scale, technology, and strategic weight mark them as defining builds for the 2024–2031 power generation and grid construction cycle.

Spotlight 01 · Under Construction

Grain Belt Express — KS / MO / IL

Invenergy · Kansas to Missouri and Illinois · Phase 1 first

The largest transmission line in U.S. history — an approximately 800-mile, ±600 kV HVDC corridor designed to move up to 5,000 MW between the Kansas wind belt and MISO and PJM load. Invenergy has awarded $1.7B in construction contracts to Quanta Services and Kiewit, with Phase 1 across Kansas and Missouri moving toward full construction in 2026 per federal permitting status updates.

~800 mi HVDC corridor
5,000 MW Design capacity
$11B Program investment
Spotlight 02 · Under Construction

Homer City Energy Campus — Indiana County, PA

Homer City Redevelopment / Kiewit · former coal site, 50 mi east of Pittsburgh

The largest planned gas-fired generation campus in the country — up to 4.5 GW across seven GE Vernova 7HA.02 hydrogen-enabled turbines on a 3,200-acre former coal plant site, built to serve an AI data-center campus with PJM and NYISO interconnections. Turbine deliveries begin in 2026, with first power targeted for 2027 per 2026 reports.

4.5 GW Gas generation
7 turbines GE Vernova 7HA.02
$10B+ Campus investment
Spotlight 03 · Recently Operational

SunZia Transmission — NM / AZ

Pattern Energy · central New Mexico to south-central Arizona

A 550-mile, ±525 kV HVDC line built to carry 3,000 MW of New Mexico wind to Desert Southwest load — the transmission half of the largest clean energy infrastructure program in U.S. history, reaching commercial operations in 2026 and proving out the corridor delivery model the next decade of HVDC will reuse.

550 mi HVDC line
3,000 MW Transfer capacity
2026 Commercial operations
The Tracker

16 active power and grid construction projects

Organized by build category. We track every project below; on select builds we’re actively recruiting transmission line project managers, substation superintendents, power plant construction managers, commissioning and startup leaders, and project controls talent.

HVDC & Interregional Transmission 4 projects
Under ConstructionHVDC Transmission

Grain Belt Express (Phase 1)

Invenergy · Kansas – Missouri
~800 mi planned±600 kV HVDC$11B program

Largest transmission line in U.S. history. $1.7B in construction contracts awarded to Quanta and Kiewit; Phase 1 (Kansas–Missouri) moving toward full construction in 2026 per federal permitting status. Converter stations, line, and ROW scopes all hiring-relevant.

Recently OperationalHVDC Transmission

SunZia Transmission

Pattern Energy · New Mexico – Arizona
550 mi±525 kV HVDC3,000 MW

The transmission half of the largest clean energy infrastructure program in U.S. history — commercial operations reached in 2026, delivering New Mexico wind to Desert Southwest load centers.

Hitachi Energy HVDCHiring for this build? →
Under ConstructionHVDC Transmission

TransWest Express

TransWest Express LLC · Wyoming – Colorado – Utah – Nevada
732 mi3,000 MWHVDC + HVAC segments

Interregional corridor connecting Wyoming wind to Desert Southwest markets. Terminal and early segment construction underway, with Wyoming segments mobilizing and first in-service now targeted for 2031 per 2026 filings.

Multiple contractorsHiring for this build? →
Recently OperationalHVDC Transmission

Champlain Hudson Power Express

Transmission Developers (Blackstone) · Québec border – Queens, NY
339 mi1,250 MWFully buried HVDC

Fully buried and submarine HVDC link delivering Hydro-Québec hydropower into New York City — commercial operation reached in mid-2026, ahead of schedule, after a multi-year marine and underground construction program.

Utility Transmission, Substations & Interconnection 5 projects
Permitting / Routing765 kV Backbone

Texas 765 kV Backbone — Permian Basin Reliability Plan

Oncor / AEP Texas / LCRA / CPS Energy · West Texas – statewide ERCOT
765 kVFirst in ERCOTEnergization from ~2030

ERCOT’s first 765 kV extra-high-voltage backbone, approved by the PUCT in 2025 to serve Permian Basin and data-center load. Import paths and loop projects in CCN routing through 2026 — a decade of line and substation work behind it.

GCs TBD — routing underwayHiring for this build? →
Under ConstructionUtility Transmission

Greenlink West

NV Energy · Las Vegas – Yerington, NV
~472 mi program525 kV + 345 kVIn service 2027

Nevada’s largest transmission build — a 525 kV backbone linking southern and northern Nevada with new collector substations, under construction with in-service targeted for 2027 per utility updates. Greenlink North follows.

Multiple contractorsHiring for this build? →
Under ConstructionUtility Transmission

Boardman to Hemingway (B2H)

Idaho Power / PacifiCorp / BPA · Boardman, OR – Owyhee County, ID
290 mi500 kV1,000 MW bidirectional

Pacific Northwest–Mountain West intertie two decades in permitting, now in construction across eastern Oregon with energization targeted for 2026–2027 per utility updates.

Multiple contractorsHiring for this build? →
Under ConstructionTransmission + Substations

Colorado Power Pathway

Xcel Energy · Eastern Colorado loop
~550 mi345 kV double-circuitSegments in service

A ~550-mile 345 kV loop with new substations (Canal Crossing, Goose Creek, May Valley) opening eastern Colorado to new generation. First segments in service; remaining segments completing 2026–2027 per Xcel updates.

Multiple contractorsHiring for this build? →
Announced / PermittingTransmission + Submarine

Propel NY Energy

NYPA / New York Transco · Long Island – Westchester – Queens, NY
$3.2BThree 345 kV tiesIn service ~2030

Three new 345 kV ties between Long Island and the statewide grid, including submarine crossings of Long Island Sound. Contractors selected and construction expected to begin in 2026 per project updates.

Contractors selected 2026Hiring for this build? →
Gas Generation & Peakers 4 projects
Under ConstructionCCGT — Hydrogen-Capable

Orange County Advanced Power Station

Entergy Texas · Bridge City, TX
1,215 MWDual-fuel CCGTCOD summer 2026

Southeast Texas combined-cycle plant capable of co-firing hydrogen — more than 90% complete per late-2025 updates and in startup toward summer 2026 commercial operation. Roughly 7,000 direct construction jobs at peak.

Sargent & Lundy (EPC)Hiring for this build? →
Under ConstructionCCGT — Data Center Load

Franklin Farms Power Station

Entergy Louisiana · Richland Parish, LA
~1.5 GW on site2,260 MW programOnline 2028–2029

Ground broken on the first two of three combined-cycle units powering Meta’s $10B+ AI data center — part of a wider Entergy generation program in the Gulf South, with further plants proposed in 2026 filings.

Under ConstructionGas Campus — AI Load

Homer City Energy Campus

Homer City Redevelopment · Indiana County, PA
Up to 4.5 GW7× GE Vernova 7HA.02$10B+ campus

The country’s largest planned gas-fired campus, rising on a 3,200-acre former coal plant site to serve AI data-center load with PJM and NYISO interconnections. Turbine deliveries from 2026; first power targeted 2027 per 2026 reports.

Kiewit Power ConstructorsHiring for this build? →
Recently OperationalSimple-Cycle Peakers

T.H. Wharton Peakers

NRG Energy · Houston, TX
456 MWSimple-cycle~$360M

First newbuild generation delivered under the Texas Energy Fund — new simple-cycle peaking units at the T.H. Wharton site reaching commercial operation in May 2026 to firm the Houston grid.

Storage & Repowering 3 projects
Operational + ExpansionStandalone BESS

Nova Power Bank

Calpine · Menifee, CA (Riverside County)
680 MW2,720 MWh~$1B

One of the largest battery energy storage facilities in the country, built in phases on a former gas plant site — final phase reaching commercial operation in 2025, dispatching four-hour capacity into the Southern California grid.

Under ConstructionStandalone BESS

SOSA Energy Center

Energy Vault · Madison County, TX
150 MW300 MWhCOD 2027

ERCOT standalone battery storage that broke ground in early 2026 — one of a wave of Texas BESS builds firming data-center-driven load growth, with commercial operation targeted for 2027 per announcements.

Recently OperationalRepowering — Coal to Gas / H2

IPP Renewed

Intermountain Power Agency (operated for LADWP) · Delta, UT
840 MW2× M501JAC30% hydrogen-capable

Flagship U.S. repowering: 1,800 MW of retired coal replaced by hydrogen-capable gas units that reached commercial operation in July 2025, beside the ACES Delta salt-cavern hydrogen storage hub.

Mitsubishi Power (turbines)Hiring for this build? →

Every project shown is compiled from FERC and state PSC or PUCT filings, RTO planning documents, developer announcements, regulatory disclosures, and our own placement work across the segment.

What makes a project the tracker

To appear in the tracker, a project must meet at least three of the following criteria:

Publicly confirmed utility, IPP, developer, or owner as project sponsor.
Disclosed location at minimum to county / corridor level.
Public size figure (MW, MWh, kV, line-miles, or $ investment).
Confirmed project status (announced, permitting / routing, under construction, or recently operational).
Sourced from FERC / PUCT / state PSC filings, RTO planning documents, developer press releases, or established trade publications.
Active within the 2024–2031 delivery window relevant to current power and grid construction recruiting demand.

The tracker is maintained by iRecruit.co’s research team in coordination with our active placement work. Verify all data before referencing in formal documents. Power and transmission programs are particularly sensitive to permitting, financing, and interconnection milestones.

Related

Power and grid construction intelligence from iRecruit.co

If you’re researching power generation and grid projects, you’re likely also evaluating the workforce, EPC partners, and credential stacks needed to deliver them.

Hiring talent for a power or grid build shown here?

iRecruit.co recruits the transmission line project managers, substation superintendents, power plant construction managers, commissioning and startup leaders, and project controls talent who deliver builds like these — from project engineer to executive. A 30-minute scoping call gets you a concrete proposal within 48 hours.