HIRE TALENT  /  LEADERSHIP & EXECUTIVE  /  DIRECTOR OF PROJECT CONTROLS
Executive Construction Recruiting

Hire Directors of Project Controls

Hire Directors of Project Controls who build and run the controls function — scheduling, cost engineering, earned value, risk, and executive reporting across a portfolio. Primavera P6 program standards + forecast credibility verified through references from prior executives.

Sectors
Every sector
Data center, semiconductor, energy, life sciences, healthcare, commercial
Role scope
Controls function leader
Schedule, cost, risk, EVM across the portfolio
Geography
US + EMEA
Active project-controls leadership network
Placement warranty
Replacement guarantee
Every model, every placement
How It Works

Hire Directors of Project Controls in 3 steps

A structured process for the hire that owns forecast credibility — where a weak controls function means leadership finds out about slip and overrun months after the data knew.

Step 01

Talk to our team

30-minute call. Align on portfolio scale, controls maturity, toolset (P6, cost systems, Power BI), team size, and start date.

Step 02

Review talent

Within 2 weeks we introduce 3–5 Directors of Project Controls with portfolio-scale history. References from prior executives and program owners included.

Step 03

Hire with confidence

Every placement carries a replacement guarantee. If the hire fails within the warranty window, we run a no-fee replacement search.

Why iRecruit.co

What makes our Director of Project Controls shortlist different

Plenty of candidates have run schedules. Far fewer have built a controls function executives actually trust — consistent WBS standards, honest forecasts, and early-warning reporting that changes decisions.

Function-building verified

Every candidate has built or rebuilt a controls function — standards, staffing, and cadence — not just operated inside one. Verified with prior leadership.

Forecast credibility

Reference-verified record of cost and schedule forecasts that held up — EAC discipline, honest variance reporting, and no end-of-job surprises.

Toolset + reporting depth

Primavera P6 program standards, cost systems (EcoSys, Prism, Cobra, Sage), earned value, and Power BI executive reporting — verified hands-on and at standards level.

Vetting Criteria

What we verify on every Director of Project Controls

Before you meet a candidate, we have documented the controls record behind the resume:

Portfolio-scale controls leadership

Reference-verified leadership of controls across multiple concurrent projects or a major program.

Schedule standards

Verified P6 program standards — WBS, baseline management, float ownership, and schedule health metrics.

Cost + EVM discipline

Reference-verified cost engineering, earned value, and EAC forecasting integrity on delivered work.

Risk + change control

Verified risk-register cadence, contingency management, and change-control discipline.

Credentials

AACE certifications (PSP, CCP, EVP) and PMI-SP verified where held.

Team building

Reference-verified record of hiring and developing schedulers, cost engineers, and controls managers.

Project Controls Specializations

Match the controls leader to your portfolio

Not sure which controls leader fits?

We’ll help scope the role on the call — portfolio scale, controls maturity, toolset, and team size.

Hire Directors of Project Controls →
FAQ

Hiring a Director of Project Controls

How long does it take to hire a Director of Project Controls?

Time to shortlist is typically 2 weeks from scoping call. Director-level searches typically close in 4–6 weeks total, including references and offer.

What does it cost?

Pricing depends on engagement model. Director-level searches typically run as retained executive search or a defined per-role fee.

How is this role different from a Senior Project Controls Manager?

The Director owns the function — standards, staffing, tools, and executive reporting across the portfolio. A Senior Project Controls Manager runs controls on a program or major project within those standards.

What does a Director of Project Controls earn in 2026?

In the US, base salaries typically run $175k–$235k, with total compensation of $210k–$290k+ on hyperscale data center and semiconductor programs. Portfolio scale and sector move the band.

Do you offer a placement guarantee?

Yes. Every Director of Project Controls placement carries a replacement guarantee, confirmed in writing at engagement start.

Can you also build the team underneath the Director?

Yes. Multi-hire controls builds (schedulers, cost engineers, controls managers) route through embedded recruiting or RPO.

Ready to hire

Talk to an executive construction recruiter

30-minute scoping conversation. We’ll review the Director of Project Controls role, portfolio scale, controls maturity, and toolset — then recommend the right search path and start sourcing.

Hire Directors of Project Controls →