HIRE TALENT  /  PROJECT DELIVERY  /  MASTER SCHEDULER
Construction Recruiting

Hire Master Schedulers

Hire Master Schedulers with Primavera P6 authorship, critical path analysis, resource loading, TIA / windows / MIP.3.9 delay-forensic discipline, and program-scale schedule governance. AACE PSP + PMI-SP credentialed, sector-verified.

Sectors
Every discipline
Data center, hospital, life sciences, industrial, aviation, mission critical
Credentials
AACE PSP · PMI-SP
PSP / PMI-SP + Deltek acumen certs
Software
P6 · Fuse
Primavera P6, Acumen Fuse, MS Project, TILOS
Placement warranty
Replacement guarantee
Every model, every placement
How It Works

Hire Master Schedulers in 3 steps

A structured process for the schedule-authorship hire — where CPM integrity + resource loading decide the delay narrative.

Step 01

Talk to our team

30-minute call. Align on program scale, WBS discipline, delivery method, and start date.

Step 02

Review talent

Within 2 weeks we introduce 3–5 Master Schedulers with P6 authorship + delay-forensic history.

Step 03

Hire with confidence

Every placement carries a replacement guarantee.

Why iRecruit.co

What makes our Master Scheduler shortlist different

P6 authorship + CPM integrity

Every Master Scheduler has verified P6 authorship + CPM integrity + Acumen Fuse discipline.

Delay-forensic fluency

Reference-verified TIA / windows / MIP.3.9 delay-forensic authorship.

Resource loading

Reference-verified resource + cost loading + earned-value integration.

Vetting Criteria

What we verify on every Master Scheduler

AACE PSP / PMI-SP

Credentials verified via issuing bodies.

P6 authorship

Reference-verified P6 authorship + sample schedule review.

Delay-forensic authorship

TIA / windows / MIP.3.9 experience verified.

Software fluency

Acumen Fuse + MS Project + TILOS fluency verified.

Master Scheduler Specializations

Match the Master Scheduler specialty to your program

Not sure which Master Scheduler fits?

We’ll help scope the role on the call — program scale, WBS discipline, delivery method.

Hire Master Schedulers →
FAQ

Hiring a Master Scheduler

How long does it take to hire?

Time to shortlist is typically 2 weeks. Total time to placement is typically 3–4 weeks.

What does it cost?

Pricing depends on engagement model.

How is Master Scheduler different from Scheduler?

Master Scheduler owns program-scale P6 authorship + delay-forensic authorship. Scheduler owns project-level schedule execution.

Do you verify PSP / PMI-SP?

Yes. Credentials verified via issuing bodies.

Do you offer a placement guarantee?

Yes.

Can you build a full schedule team?

Yes. Multi-hire schedule builds route through embedded recruiting or RPO.

Ready to hire

Talk to a construction scheduling recruiter

30-minute scoping conversation. We’ll review the Master Scheduler role, program scale, WBS discipline, and delivery method — then start sourcing.

Hire Master Schedulers →