Hire Master Schedulers with Primavera P6 authorship, critical path analysis, resource loading, TIA / windows / MIP.3.9 delay-forensic discipline, and program-scale schedule governance. AACE PSP + PMI-SP credentialed, sector-verified.
A structured process for the schedule-authorship hire — where CPM integrity + resource loading decide the delay narrative.
30-minute call. Align on program scale, WBS discipline, delivery method, and start date.
Within 2 weeks we introduce 3–5 Master Schedulers with P6 authorship + delay-forensic history.
Every placement carries a replacement guarantee.
Every Master Scheduler has verified P6 authorship + CPM integrity + Acumen Fuse discipline.
Reference-verified TIA / windows / MIP.3.9 delay-forensic authorship.
Reference-verified resource + cost loading + earned-value integration.
Credentials verified via issuing bodies.
Reference-verified P6 authorship + sample schedule review.
TIA / windows / MIP.3.9 experience verified.
Acumen Fuse + MS Project + TILOS fluency verified.
We’ll help scope the role on the call — program scale, WBS discipline, delivery method.
Time to shortlist is typically 2 weeks. Total time to placement is typically 3–4 weeks.
Pricing depends on engagement model.
Master Scheduler owns program-scale P6 authorship + delay-forensic authorship. Scheduler owns project-level schedule execution.
Yes. Credentials verified via issuing bodies.
Yes.
Yes. Multi-hire schedule builds route through embedded recruiting or RPO.
30-minute scoping conversation. We’ll review the Master Scheduler role, program scale, WBS discipline, and delivery method — then start sourcing.
Hire Master Schedulers →