Vetted SpecialistsExample profileAlexis R.Facilities Operations Manager, Battery Cell PlantRan facilities operations for a 1.4M SF cell plant — dry rooms, chilled water, compressed air, N2 and process exhaust on 24/7 rotationLed facilities-side startup of two new cell lines: utility tie-ins, commissioning turnover, spares and SOPs before first productionManaged $14M O&M budget and 38 supervisors, techs and contractors; PM completion held above 95% for two yearsDry-room HVACSAP PMCMRP
Vetted SpecialistsExample profileDiego R.Site Facilities Operations Manager, Propulsion Test ComplexOwned utilities and facilities for a rocket-engine test site — high-pressure GN2 and GHe, LN2 storage, deluge water, 12.47 kV distributionBuilt the PM/PdM program from a paper system into a CMMS with routes, criticality rankings and a spares strategyCut unplanned utility outages 40% in 18 months; rebid mechanical and electrical service contracts with defined SLAsCryogenic systemsMV distributionNFPA 70E
Vetted SpecialistsExample profileSofia T.Facilities Operations Manager, 200mm Fab and CampusRan day-to-day operations across a fab, sub-fab and three support buildings — UPW, process cooling water, bulk gases, exhaust scrubbersDirected a team of 6 supervisors and 44 technicians across 4 shifts; reduced overtime 22% by rebalancing shift coverageDelivered $3.2M capital-renewal program (chillers, cooling towers, switchgear) without a fab interruptionUPW & PCWMaximoCapital renewal