Vetted SpecialistsExample profileTrevor B.Master Scheduler, Munitions ComponentsOwned the MPS for a 2,400-part-number munitions-component line in SAP PP, releasing planned orders weekly across 18 work centers with schedule attainment moved from 78% to 93% in a yearBuilt the rate-ramp plan from 300 to 1,100 units a month, sequencing tooling deliveries, second-shift start, and energetics-cell capacity so the ramp shipped on the contract dateCleaned MRP parameters on 600 part numbers — lead times, lot sizes, safety stock — cutting reschedule-in messages 60% and past-due planned orders to near zeroSAP PPRate rampsCapacity planning
Vetted SpecialistsExample profileLuca G.Production Planner, Propulsion & StructuresPlanned engine and tank structure builds in Oracle with a Plex MES layer — 900 active part numbers, 11 work centers including autoclave, X-ray, and cryo-proof testRan the daily dispatch list and re-sequenced around three test-stand outages in one quarter without missing an integration dateDelivered the material plan for a 5x vehicle ramp: kitting lead times, long-lead valves and forgings, and WIP held to a 40-day targetOracle + Plex MESDispatch schedulingMaterial planning
Vetted SpecialistsExample profileNathan R.Production Control Planner, Cell & ModuleScheduled cell formation and module assembly for a battery plant in NetSuite tied to an Ignition MES — 24/7 operation, 4 crews, weekly build plan issued every ThursdayOwned the demand, supply, and inventory inputs to monthly S&OP, reconciling the commercial forecast to formation capacity so the plan stopped loading past the constraintHeld finished-goods and WIP inventory to targets through commissioning by resetting safety stock as yields improved instead of carrying the launch bufferNetSuite + IgnitionS&OP inputs24/7 scheduling