Vetted SpecialistsExample profileRicardo P.Gigafactory Site Development EngineerOwned mass grading and earthwork balance on a 1,100-acre battery cell campus — 9M CY moved, cut-fill closed within 2% of designCoordinated 345 kV substation interconnect, 20 MGD water agreement, and gas lateral with three utilities to hit a pad-ready date 5 weeks earlyRan field engineering through sitework: subgrade acceptance, unsuitable-soil RFIs, MSE wall and pond as-builtsPE (Civil)Civil 3D + TrimbleUtility interconnect
Vetted SpecialistsExample profileCamila A.Launch Site Development EngineerSite development for a new orbital launch pad and integration hangar — access road, flame trench excavation, cryogenic farm pads, and deluge pondManaged environmental permitting stack: USACE 404 wetland permit, Section 7 consultation, FAA and range environmental review, NPDES CGP coverageGeotech coordination for deep foundations on coastal sands: boring program, liquefaction analysis, and ground-improvement scopeCPESCUSACE 404 / NEPACoastal geotech
Vetted SpecialistsExample profileDiego R.Data Center Campus Site Development EngineerDelivered phased pad-ready sites for six 100 MW halls on a 300-acre campus, sequencing grading, roads, and duct banks around live hallsCoordinated dual-feed 230 kV interconnect and reclaimed-water supply with the utility and county on a 22-month critical pathField-engineered stormwater vaults, retaining walls, and 40-ft cut slopes; resolved 140+ sitework RFIs without slab delaysPE (Civil)Stormwater designPhased campus sitework