Vetted SpecialistsExample profileMei L.Tooling Engineer, Composite AerostructuresDesigned 14 Invar and composite layup tools for a wing-skin program in CATIA V5 — thermal-growth compensated, autoclave-certified, all bought off on first tryoutCut recurring trim-and-drill fixture setup from 45 minutes to 12 with modular quick-change details across 6 part numbersOwned laser-tracker tool certification and 18-month recertification schedule for 60 active tools under AS9100Layup toolingCATIA V5Laser tracker
Vetted SpecialistsExample profileOmar Z.Senior Tooling Engineer, Launch Vehicle StructuresLed tool design in NX for a 12-foot-diameter tank-dome friction-stir-weld fixture and the barrel-section assembly jig that followed itBuilt the rate-tooling plan that took a stage-assembly line from 2 to 12 vehicles a year — 38 new tools, $9M tool budget, delivered inside the line-activation dateRan tool tryout and buyoff with quality and manufacturing engineering; first-article hole position held inside 0.005 inch on every jigAssembly jigsSiemens NXRate tooling
Vetted SpecialistsExample profileRenata S.Tooling Engineer, Munitions and Precision MachiningDesigned 90 machining, welding and inspection fixtures in SolidWorks for a guided-munition airframe line — GD&T datum schemes traced to the drawing and stack-ups documentedIntroduced hydraulic zero-point workholding on 5-axis cells that cut fixture changeover 60% and lifted OEE 9 pointsManaged outside tool vendors under ITAR and DFARS controls with on-time delivery above 95% across 2 yearsMachining fixturesGD&TVendor management