Per-MW pricing, regional variance, and cost drivers for owners scoping hyperscale & AI builds.
Salary benchmarks across the 14 mission-critical disciplines.
VIVIFY Technology has signed a letter of intent to serve as the primary hydrogen energy infrastructure provider for ELISIUM, a planned cognitive city in Hendry County, Florida, with energy planning expected to begin before roads and other horizontal construction.
The Florida-based hydrogen energy company announced the agreement with master developer ELISIUM, LLC on Oct. 20, 2026. The proposed collaboration remains subject to definitive agreements, permitting, and regulatory requirements.
The letter of intent is non-binding with respect to the collaboration. It sets no pricing, capacity, or exclusivity and does not obligate either company to buy or deploy equipment.
VIVIFY is expected to participate in master planning from the outset, helping identify generation sites, distribution corridors, equipment footprints, and water supply requirements before horizontal construction begins.
The company intends to design, deploy, and commission hydrogen energy infrastructure, with initial capacity potentially supporting construction power and the first civic and commercial facilities. Additional modules would allow capacity to grow as development phases come online.
Depending on site conditions and applicable law, installations could operate behind the meter, as an islanded microgrid, or in coordination with the local electric utility. VIVIFY also plans to provide ongoing operations and maintenance support and help develop an energy infrastructure roadmap aligned with ELISIUM’s construction phases.
Jason Herring, Founder and Chief Executive Officer of VIVIFY Technology, said,
A city designed to think cannot wait on a grid that was designed for the last century.
"ELISIUM made a decision most developers never get the chance to make: put the power in the plan before the first road is poured. That is exactly where hydrogen belongs. We are engineering our platforms to scale with demand. ELISIUM plans to grow phase by phase, and our goal is for the power to grow with it."
The planned collaboration is expected to use VIVIFY’s Hydrogen Oxygen Generator™ (HOG™) platform and The Flying Pig™, its containerized configuration designed for modular deployment.
The companies also intend to evaluate VIVIFY’s Clean Air Technology™ emissions control system for any solid-waste processing or waste-to-energy facility within ELISIUM.
ELISIUM, LLC has said it anticipates groundbreaking within approximately 18 to 24 months, with the first energy infrastructure requirements expected about six months after groundbreaking. The development still requires zoning and entitlement approvals, as well as financing.
The companies intend to structure any arrangement to comply with applicable Florida law and regulation, including regulation by the Florida Public Service Commission. Definitive agreements remain to be negotiated, and either party may terminate the letter of intent.
Read the source