Reindustrialization Factory Construction Tracker

24 named reindustrialization factory, launch-site, and shipyard construction programs across the U.S. — new-space and defense-tech builds by region, status, owner, and size — with the construction and operations hiring behind each one.

Hire Top Talent
Explore Jobs
Refreshed monthly · compiled from company announcements, state and local economic-development records, permit filings, and trade publications. Last refreshed: see methodology.
24
Named reindustrialization factory, launch-site, and shipyard construction programs tracked across the U.S.
$25B+
Aggregate disclosed capital investment across the 10 programs with a public dollar figure.
11.4M+ sq ft
Disclosed factory floor area across the 17 programs with a public square-footage figure.
8
Programs currently under construction — the active field-hiring window for construction and commissioning scopes.
13 states
Across 6 regions — West, Texas & Gulf, Southeast, Midwest, Northeast, Mountain / Southwest.
Browse

Browse by region

Jump to a regional section. Each program card carries owner, location, scope, status, and the construction and production leadership roles a build of that type needs.

Featured Spotlights

The marquee builds of the reindustrialization cycle

Five programs whose scale and pace define the 2024–2027 factory-building wave — each one hiring twice: the construction team that delivers the building and the operations team that stands up the line inside it.

Spotlight 01 · Phase 1 Operating

Anduril — Arsenal-1 hyperscale manufacturing campus

Anduril Industries · Ashville (Pickaway County), OH · 500-acre, ~12-building master plan

The defining build of the reindustrialization cycle: a $910M-committed, 5M sq ft autonomous-weapons campus with 4,008 jobs planned. Phase 1 (775,000 sq ft) is producing Fury while the second building and the balance of the campus are still in construction — so the site is hiring a construction team and a production team at the same time.

$910M Committed by Anduril
5M sq ft Campus master plan
150/yr Fury line capacity
Spotlight 02 · Under Construction

SpaceX — Starfactory and Gigabay, Starbase

SpaceX · Starbase (Boca Chica), TX · Starship production and vertical integration

The highest-cadence rocket factory in the country is still expanding: Starfactory builds ships and boosters while the ~380 ft Gigabay goes up beside it to integrate and refurbish them. Four tower cranes, a $250M registered build value and a one-ship-per-day ambition put this among the most demanding structural and commissioning scopes in the tracker.

~1M sq ft Starfactory
~700K sq ft Gigabay integration
~$250M Gigabay registered value
Spotlight 03 · Under Construction

SpaceX and Tesla — Terafab semiconductor fab

SpaceX (with Tesla; Intel as primary foundry partner) · Grimes County, TX (prototype line at Giga Texas, Austin) · 6,000-acre, four-phase fab program

The largest single factory program in the tracker by dollar value: a $16.8B initial phase toward a fab campus that filings size at up to 100M sq ft. Fab construction is the most facilities-intensive scope in manufacturing — cleanrooms, ultrapure water, gas and chemical systems — which makes it the deepest MEP and commissioning hiring well on this page.

$16.8B Initial phase
6,000+ acres Under contract
1,800+ Jobs planned
Spotlight 04 · Operating + Expanding

Hadrian — Factory 3 (F3), Mesa

Hadrian · Mesa (Phoenix-Mesa Gateway), AZ · Automated machining at scale

A $200M, 290,000 sq ft software-defined machine shop that went from announcement to production in about six months — and the template Hadrian says it will repeat, with additional factories funded by a $1.37B Series D and a $360M credit facility. F3 is the clearest example of factory-as-product in the tracker.

$200M Investment
290,000 sq ft Factory 3
350+ Jobs
Spotlight 05 · Announced

Saronic — Port Alpha shipyard, Brownsville

Saronic Technologies · Port of Brownsville (Cameron County), TX · 835-acre software-defined shipyard

The first greenfield shipyard of its kind in decades: a $3B-plus yard on 835 acres with room to grow to about 4,400, built to turn out autonomous vessels the way a factory turns out vehicles. Up to 10,000 direct jobs and a ~$750M annual payroll are planned, and the waterfront civil scope alone is a multi-year hiring program.

$3B+ Investment
835 acres Initial site
10,000 Direct jobs planned
The Tracker

24 active programs

Organized by region. Every program is compiled from public sources; the role lines on each card describe the leadership a build of that type typically requires, not an engagement with the owner.

West 7 programs
AnnouncedDefense tech

Anduril — Long Beach engineering and flight-test campus

Anduril Industries · Long Beach / Lakewood (Douglas Park), CA
$1B+~1.1M sq ft6 buildings5,500 jobs

Six-building campus at Douglas Park — about 750,000 sq ft of office and 435,000 sq ft of R&D — for engineering, software, flight test and program support behind Fury and other systems. Developed by Sare Regis Group, which also delivered Rocket Lab's nearby headquarters. Construction is slated to start with the first building targeted about two years out; construction cost described as in the hundreds of millions. General contractor not disclosed.

Roles a build like this needs: campus construction director, MEP and lab-fitout project managers, facilities director, EHS manager, test operations leadHiring for this build? →
Under ConstructionAdvanced manufacturing

Divergent — second factory, Long Beach

Divergent Technologies · Long Beach, CA
430,000 sq ft64 Monolith One printers~1,000 jobs at capacity

A 400,000 sq ft manufacturing hall plus 30,000 sq ft of office housing 64 Monolith One 12-laser metal printers, commissioned over 24 months. Planned output is 3D-printed metal structures at munitions scale — 30,000-plus 500-lb-class missile airframes or 60,000-plus warhead casings a year, including Tomahawk components — alongside automotive subframes. Staff are already moving in ahead of opening. Investment not disclosed. General contractor not disclosed.

Roles a build like this needs: additive manufacturing operations manager, equipment installation and commissioning leads, facilities engineer, quality director, EHS manager, materials supply chain managerHiring for this build? →
Operating + ExpandingNew space

Vast — space-station manufacturing campus, Long Beach

Vast · Long Beach, CA
189,000 sq ft~950 employees at opening

Headquarters and production campus near Long Beach Airport where Vast builds Haven-1 and Haven-2 commercial space-station modules with about 90 percent of parts made in-house; Haven-1's primary structure was welded on site. Investment not disclosed. No additional Long Beach building has been announced. General contractor not disclosed.

Roles a build like this needs: production operations manager, welding and structures engineering leads, facilities manager, quality manager, supply chain managerHiring for this build? →
Operating + ExpandingDefense tech

True Anomaly — Long Beach production facility

True Anomaly · Long Beach, CA
90,000 sq ft70,000 sq ft production and design

Product development and production plant near Long Beach Airport — 70,000 sq ft of design and production space plus 20,000 sq ft of office — for Jackal-class spacecraft hardware, software and payloads, sited for proximity to Space Systems Command and Vandenberg. Investment and headcount not disclosed. General contractor not disclosed.

Roles a build like this needs: spacecraft production manager, integration and test lead, facilities manager, quality manager, EHS coordinatorHiring for this build? →
AnnouncedNew space

Varda Space Industries — El Segundo manufacturing expansion

Varda Space Industries · El Segundo, CA
205,443 sq ft9-acre campus+50,000 sq ft biopharma space

Lease of the nine-acre former Mattel R&D campus on East Mariposa Avenue to expand headquarters and add capacity to build spacecraft and reentry capsules at scale for orbital pharmaceutical processing and hypersonic reentry testing, plus a separate 50,000 sq ft biopharma space nearby. Build-out cost, occupancy date and job count not disclosed. General contractor not disclosed.

Roles a build like this needs: tenant-improvement project manager, facilities director, cleanroom and lab fitout engineers, production operations manager, quality managerHiring for this build? →
Operating + ExpandingDefense tech

Mach Industries — Forge 1, Huntington Beach

Mach Industries · Huntington Beach, CA
115,000 sq ft$900M raised to scale manufacturing

Headquarters and manufacturing plant producing Viper VTOL aircraft, Glide air-to-ground weapons and Dart counter-UAS, with propulsion, energetics and production infrastructure spread across California following the Exquadrum acquisition. A $300M Series C and a $600M extension are earmarked to expand manufacturing infrastructure; no new building size has been disclosed. General contractor not disclosed.

Roles a build like this needs: manufacturing operations director, energetics and propulsion facility managers, EHS and explosives safety lead, quality manager, supply chain managerHiring for this build? →
AnnouncedNew space

Stoke Space — Kent manufacturing and Moses Lake test-site expansion

Stoke Space · Kent and Moses Lake, WA
Test site 75 to 550 acres$1B Series E funding

The Scaling Nova plan expands the Moses Lake Test Site from 75 to 550 acres with purpose-built stands for engine components through full Nova stages, designed to limit noise and community impact, while Kent remains headquarters and manufacturing for the fully reusable Nova vehicle and its Andromeda and Zenith engines. Kent square footage, new-building and job figures not disclosed. General contractor not disclosed.

Roles a build like this needs: test-site construction manager, propellant systems and cryogenic engineers, facilities engineering lead, EHS director, test operations managerHiring for this build? →
Texas & Gulf 6 programs
Under ConstructionNew space

SpaceX — Starfactory and Gigabay, Starbase

SpaceX · Starbase (Boca Chica), TX
~$250M Gigabay~1M sq ft Starfactory~700K sq ft Gigabay24 work cells

Starfactory, roughly 1M sq ft, has been producing Starship ships and Super Heavy boosters since its latest phase came online. Next to it, the ~700,000 sq ft, ~380 ft tall Gigabay integration building — about 815,000 sq ft of workspace across levels, 24 work cells and 400-ton cranes — is rising on the footprint of the demolished High Bay, with a registered value of about $250M and a target of up to one ship per day. General contractor not disclosed.

Roles a build like this needs: heavy-civil and structural-steel superintendents, crane and rigging managers, facilities engineering lead, production control manager, EHS managerHiring for this build? →
Under ConstructionSemiconductor

SpaceX and Tesla — Terafab semiconductor fab

SpaceX (with Tesla; Intel as primary foundry partner) · Grimes County, TX (prototype line at Giga Texas, Austin)
$16.8B initial phaseUp to 100M sq ft at full build6,000+ acres1,800+ jobs

Full-scale fab site near Gibbons Creek Reservoir east of College Station, with a small prototype line broken ground at Giga Texas in Austin. The state announced a $16.8B initial phase alongside a $30M Texas Enterprise Fund grant; county filings cite $55B and Comptroller applications up to $119B across four phases. Land clearing is underway. Planned output: AI inference and training chips, memory and multi-chip modules for Tesla vehicles, Optimus robots and SpaceX space computing. General contractor not disclosed.

Roles a build like this needs: cleanroom construction managers, fab facilities and MEP directors, tool-install and hookup managers, EHS and gas safety leads, process engineering managersHiring for this build? →
AnnouncedAutonomous maritime

Saronic — Port Alpha shipyard, Brownsville

Saronic Technologies · Port of Brownsville (Cameron County), TX
$3B+835 acres (expandable to ~4,400)Up to 10,000 jobs

Next-generation shipyard for autonomous and uncrewed naval vessels, sited at the Port of Brownsville after a multi-state competition. Initial capability targets ships up to 850 ft, later beyond 1,200 ft. Incentives include an $80M Texas Enterprise Fund grant and a roughly $211M county tax abatement contingent on 35 percent local hiring. Pre-construction, with groundbreaking slated and operations targeted roughly two years later. General contractor not disclosed.

Roles a build like this needs: shipyard construction director, marine and heavy-civil superintendents, dredging and waterfront engineers, EHS director, production planning and supply chain leadsHiring for this build? →
Operating + ExpandingNew space

Firefly Aerospace — Cedar Park campus and Rocket Ranch expansion

Firefly Aerospace · Cedar Park and Briggs, TX
144,000 sq ft Cedar Park217,000 sq ft Rocket Ranch200 acres$8.2M state grant

Doubled Cedar Park spacecraft campus with a cleanroom four times the prior size and the Gloworks innovation lab (titanium printing, composites, welding, automated milling), plus 30,000 sq ft of new mezzanines at the 200-acre Rocket Ranch in Briggs, which was itself doubled for the Eclipse medium launch vehicle. Output spans Blue Ghost landers, Elytra orbital vehicles, Alpha rockets and Eclipse engines. Investment and headcount not disclosed. General contractor not disclosed.

Roles a build like this needs: facilities director, cleanroom fitout project manager, manufacturing engineering manager, quality director, test range operations leadHiring for this build? →
Under ConstructionAutonomous maritime

Saronic — Franklin shipyard expansion

Saronic Technologies · Franklin (St. Mary Parish), LA
$300M300,000+ sq ft added1,500 jobsGC: JE Dunn / Alberici JV

Expansion of the former Gulf Craft yard, which already produces the 180-ft Marauder autonomous vessel, adding three construction slips, an expanded warehouse and a dedicated autonomous-vessel production line. A JE Dunn Construction and Alberici Constructors joint venture placed the final structural beam after roughly ten months of work, with completion targeted early next year and a peak construction workforce of about 200.

Roles a build like this needs: marine construction superintendent, shipyard facilities manager, production line manager, EHS director, quality and supply chain leadsHiring for this build? →
AnnouncedLaunch infrastructure

SpaceX — Starbase Louisiana spaceport and production campus

SpaceX · Pecan Island (Vermilion Parish), LA
$100B~125,000 acres (press reports)3,000 direct jobs10 launch pads

Announced by the state as the largest capital investment in Louisiana history: five launch complexes with ten pads, propellant production, power generation, vehicle processing facilities and worker housing on former Exxon coastal property. Incentives include a roughly $820M PILOT arrangement, aerospace facility rebates and LED FastStart. Construction start is planned for next year with first launches targeted two years after that. General contractor not disclosed.

Roles a build like this needs: program director, heavy-civil and marine construction superintendents, utility and propellant infrastructure engineers, EHS director, workforce housing and logistics leadsHiring for this build? →
Southeast 3 programs
Phase 1 OperatingLaunch infrastructure

Stoke Space — Launch Complex 14 rebuild for Nova

Stoke Space · Cape Canaveral Space Force Station, FL
1.2M lbf launch mount9.5-mile utility network121-ft umbilical tower

Rebuild of the historic Friendship 7 pad as the launch, landing and horizontal-integration site for the fully reusable Nova rocket. Earthwork, a 9.5-mile utility network, the launch mount, umbilical tower and horizontal integration facility steel were completed first; the pad, oxygen, fuel and water farms and HIF are now reported complete ahead of Nova Pathfinder's first orbital launch. Total pad cost not disclosed; a $260M Series C was earmarked in part to finish construction. General contractor not disclosed.

Roles a build like this needs: launch-site construction manager, ground systems and fluids engineers, commissioning lead, EHS director, pad operations managerHiring for this build? →
Under ConstructionNew space

SpaceX — Gigabay Starship integration facility, Kennedy Space Center

SpaceX · Merritt Island (Kennedy Space Center), FL
Part of ~$1.8B FL build-out815,000+ sq ft workspace380 ft tall600+ Florida jobs planned

Centerpiece of SpaceX's roughly $1.8B Florida Starship expansion: a 380-ft integration building on Roberts Road with 815,000-plus sq ft of workspace across levels, 24 work cells and cranes rated to 400 tons for processing and refurbishing Starship vehicles and Super Heavy boosters. The structure has topped out with roof closure and door installation underway; a co-located Starship production factory about 50 percent larger than the Texas plant is also planned. General contractor not disclosed.

Roles a build like this needs: structural and high-bay construction superintendents, crane and rigging managers, MEP commissioning lead, facilities director, EHS managerHiring for this build? →
Phase 1 OperatingPropulsion

Anduril Rocket Motor Systems — solid rocket motor complex, McHenry

Anduril Industries · McHenry (Stone County), MS
$75M private + $58M DPA Title III6,000 motors/yr target

Expansion that opened for full-rate production of tactical and mid-size solid rocket motors, making Anduril the third U.S. supplier. Two Defense Production Act Title III awards — $14.3M and a further $43.7M — fund test-fire infrastructure, storage and manufacturing tooling toward a stated goal of 6,000 motors a year. Square footage and headcount not disclosed. General contractor not disclosed.

Roles a build like this needs: energetics facility manager, explosives safety and EHS director, process engineering manager, test operations lead, quality managerHiring for this build? →
Midwest 2 programs
Phase 1 OperatingDefense tech

Anduril — Arsenal-1 hyperscale manufacturing campus

Anduril Industries · Ashville (Pickaway County), OH
$910M committed5M sq ft master plan500 acres4,008 jobs planned

Build-to-suit campus near Rickenbacker International Airport developed with CT Realty. The first 775,000 sq ft production building is running — the first Ohio-built Fury collaborative combat aircraft has rolled off the line, with a capacity target of up to 150 aircraft a year — while a second building stands as a shell and follow-on buildings continue toward a 5M sq ft, roughly 12-building master plan. General contractor not disclosed.

Roles a build like this needs: construction project executive, campus facilities director, EHS manager, manufacturing engineering lead, quality director, supply chain managerHiring for this build? →
Operating + ExpandingNew space

Redwire — Space Research and Manufacturing Facility, Novaparke

Redwire Corporation · Georgetown (Floyd County), IN
30,000 sq ft25 jobs

Purpose-built facility at the Novaparke Innovation and Technology Campus, opened roughly two years after groundbreaking, housing expanded life-sciences labs, the 3D BioFabrication technology behind the first 3D-printed human meniscus in space, and a Payload Operations Control Center for ISS communications. Investment not disclosed. General contractor not disclosed.

Roles a build like this needs: lab facilities manager, payload operations manager, quality engineer, EHS coordinatorHiring for this build? →
Northeast 4 programs
Phase 1 OperatingAutonomous maritime

Anduril — autonomous underwater vehicle plant, Quonset Point

Anduril Industries · North Kingstown (Quonset Business Park), RI
150,000 sq ft100+ jobs over five years200+ Dive-LD hulls/yr

Purpose-built production facility for Dive-LD and Dive-XL autonomous underwater vehicles for the U.S. Navy, with capacity for more than 200 large-diameter hulls and dozens of Dive-XLs a year and in-water testing in Narragansett Bay from a new Port of Davisville dock. Full-rate large-diameter production and a separate Dive-XL line are ramping. Investment not disclosed. General contractor not disclosed.

Roles a build like this needs: production manager, composites and hull fabrication leads, facilities manager, quality director, EHS manager, waterfront test operations leadHiring for this build? →
Under ConstructionAdvanced manufacturing

REGENT Craft — seaglider manufacturing facility, Quonset Point

REGENT Craft · North Kingstown (Quonset Business Park), RI
255,000 sq ft300 jobs (up to 750 over 10 years)~$17M state incentives

New 255,000 sq ft plant for the all-electric 12-passenger Viceroy seaglider, backed by up to about $17M in state incentives and a $240M Series B. The first human-crewed Viceroy has flown in Narragansett Bay, but the factory's opening has not been confirmed in an opened source, so status should be re-verified at the next refresh. Investment not disclosed. General contractor not disclosed.

Roles a build like this needs: plant manager, composites manufacturing engineering lead, facilities manager, quality director, EHS manager, supply chain managerHiring for this build? →
Phase 1 OperatingLaunch infrastructure

Rocket Lab — Neutron Production Complex and Launch Complex 3, Wallops

Rocket Lab · Wallops Island, VA
250,000 sq ft production complex13,000 kg to LEO

Neutron assembly, integration, test, launch and landing site at the Mid-Atlantic Regional Spaceport. Launch Complex 3 has been declared complete and has hosted launch simulations; the adjacent 250,000 sq ft production complex received the captive fairing and is working through Stage 1 qualification ahead of the medium-lift rocket's first flight. Investment and headcount not disclosed. General contractor not disclosed.

Roles a build like this needs: launch-site facilities manager, ground systems engineering lead, integration and test manager, commissioning lead, EHS managerHiring for this build? →
Under ConstructionAdvanced manufacturing

Rocket Lab — Space Structures Complex, Middle River

Rocket Lab · Middle River (Baltimore County), MD
113,000 sq ft renovation65 jobs$1.56M state loan

Renovation of the former Lockheed Martin Vertical Launch Building — a century-old aerospace manufacturing site — into a carbon-composites complex for spacecraft buses, structural panels, satellite dispensers, heat shields, pressure vessels and launch-vehicle structures including Neutron. Not a greenfield build; local coverage reported the facility taking shape, but an operating confirmation could not be opened, so status should be re-verified at the next refresh. Investment not disclosed. General contractor not disclosed.

Roles a build like this needs: renovation project manager, composites manufacturing engineering lead, facilities manager, quality manager, EHS coordinatorHiring for this build? →
Mountain / Southwest 2 programs
Operating + ExpandingAdvanced manufacturing

Hadrian — Factory 3 (F3), Mesa

Hadrian · Mesa (Phoenix-Mesa Gateway), AZ
$200M290,000 sq ft350+ jobs

Automated precision-machining factory for aerospace and defense components, opened with production already underway at the ribbon cutting and paired with a software hub. Hadrian has since raised a $1.37B Series D, added a Navy-partnered submarine-parts facility in Muscle Shoals, Alabama, and says its footprint is just under 3M sq ft across four sites, with additional factories and munitions and autonomous-systems lines planned. General contractor not disclosed.

Roles a build like this needs: plant manager, manufacturing engineering manager, automation and controls lead, quality manager, facilities manager, supply chain managerHiring for this build? →
Under ConstructionPropulsion

Castelion — Project Ranger hypersonic manufacturing campus

Castelion Corporation · Rio Rancho (Sandoval County), NM
$220M+ at groundbreaking1,000+ acres21 buildings~300 jobs

Twenty-one-building campus for solid rocket motor production, static test and final assembly of the Blackbeard hypersonic strike weapon, broken ground with the governor and Army and Navy officials present. The first building is targeted for completion this summer with all 21 buildings operational by year-end and preliminary production early next year; the company has since cited $250M-plus of committed infrastructure, a $1B Series C and a Navy production order of up to $200M. General contractor not disclosed.

Roles a build like this needs: campus construction director, energetics and explosives safety lead, test-stand and facilities engineers, production operations manager, quality director, supply chain managerHiring for this build? →
Methodology

How iRecruit.co tracks reindustrialization factory construction

Every program shown is compiled from company announcements, state and local economic-development records, permit and planning filings, and established trade publications. Last refreshed: September 2026 · refreshed monthly.

What makes a program the tracker

To appear, a program must meet at least three of the following criteria:

Publicly confirmed owner building or expanding a factory, launch site, or shipyard for aerospace, defense-tech, or advanced-manufacturing output.
Disclosed location at minimum to municipality level.
Public size figure (square footage, acreage, dollar investment, or a production-rate target).
Confirmed status — announced, under construction, phase 1 operating, or operating with an active expansion.
Sourced from a company press release, a government or economic-development record, or an established trade or local news outlet that we opened.
2024–2027 vintage: groundbreaking, opening, or expansion falling inside the current construction-recruiting window.

The tracker is maintained by iRecruit.co’s research team. Figures marked not disclosed are exactly that — we do not estimate them. Verify all data before referencing in formal documents. Square footage, investment totals, and timelines shift as programs are re-baselined; each card links only to what was public at the last refresh. iRecruit is assembling candidate density across these segments — Advanced manufacturing, Autonomous maritime, Defense tech, Launch infrastructure, New space, Propulsion, Semiconductor — ahead of the demand; listing a program here does not indicate any engagement with its owner.

Sources

  1. First Ohio-Built Fury Rolls Off Anduril's Arsenal-1 Production Line (JobsOhio) — Anduril — Arsenal-1 hyperscale manufacturing campus (Jul 2026)
  2. JChristina Describes SpaceX Robot Construction for Mass Production of Starship Block 3 (NextBigFuture) — SpaceX — Starfactory and Gigabay, Starbase (Jan 2026)
  3. Elon Musk's 100M-sq-ft Terafab rises in Grimes County as neighbors struggle to sell their land (Yahoo Finance) — SpaceX and Tesla — Terafab semiconductor fab (Aug 2026)
  4. Hadrian Celebrates Ribbon Cutting of Factory 3 (F3) in Mesa, Arizona (PR Newswire) — Hadrian — Factory 3 (F3), Mesa (Jan 2026)
  5. Saronic picks Brownsville, Texas, for $3 billion Port Alpha shipyard (Defense News) — Saronic — Port Alpha shipyard, Brownsville (Jul 2026)
  6. Drone maker Anduril announces $1 billion expansion in Long Beach (Long Beach Post) — Anduril — Long Beach engineering and flight-test campus (Jan 2026)
  7. Divergent Builds Monolith One and Announces Second Factory (PR Newswire) — Divergent — second factory, Long Beach (Jun 2026)
  8. Vast unveils new headquarters in Long Beach (Long Beach Post) — Vast — space-station manufacturing campus, Long Beach (Jul 2025)
  9. True Anomaly Expands to Long Beach (Payload) — True Anomaly — Long Beach production facility (Feb 2025)
  10. CBRE Facilitates 205,443-Square-Foot Lease in El Segundo to Varda Space Industries (CBRE) — Varda Space Industries — El Segundo manufacturing expansion (Mar 2026)
  11. Mach Industries Raises Additional $600 Million to Scale Defense Manufacturing (PR Newswire) — Mach Industries — Forge 1, Huntington Beach (Sep 2026)
  12. Scaling Nova (Stoke Space) — Stoke Space — Kent manufacturing and Moses Lake test-site expansion (Sep 2026)
  13. Firefly Aerospace Accelerates Spacecraft Production with Expanded Campus and Innovation Lab in Central Texas (Firefly) — Firefly Aerospace — Cedar Park campus and Rocket Ranch expansion (May 2026)
  14. JE Dunn, Alberici Place Final Beam in $300m Saronic Expansion (MarineLink) — Saronic — Franklin shipyard expansion (Aug 2026)
  15. SpaceX Launches New Era of Commercial Spaceflight with $100 Billion Louisiana Campus (Louisiana Economic Development) — SpaceX — Starbase Louisiana spaceport and production campus (Aug 2026)
  16. From Mercury to Nova: Launching the Future at Space Launch Complex 14 (Stoke Space) — Stoke Space — Launch Complex 14 rebuild for Nova (Jul 2025)
  17. SpaceX Gigabay, Merritt Island (OFTMW project tracker) — SpaceX — Gigabay Starship integration facility, Kennedy Space Center (Jul 2026)
  18. Anduril Secures $43M to Boost US Solid Rocket Motor Production (The Defense Post) — Anduril Rocket Motor Systems — solid rocket motor complex, McHenry (Feb 2026)
  19. Redwire opens Space Research and Manufacturing Facility in Floyd County (Inside INdiana Business) — Redwire — Space Research and Manufacturing Facility, Novaparke (Jul 2026)
  20. Reed helps celebrate the opening of a new manufacturing facility at Quonset Business Park (WJAR NBC 10) — Anduril — autonomous underwater vehicle plant, Quonset Point (Aug 2025)
  21. Quonset celebrates groundbreaking for new REGENT facility (Quonset Development Corporation) — REGENT Craft — seaglider manufacturing facility, Quonset Point (Jan 2025)
  22. Window for launch debut of Rocket Lab's Neutron rocket 'is narrowing' as development continues (Spaceflight Now) — Rocket Lab — Neutron Production Complex and Launch Complex 3, Wallops (Aug 2026)
  23. Governor Moore Announces Rocket Lab to Open Manufacturing Facility in Baltimore County (Maryland Department of Commerce) — Rocket Lab — Space Structures Complex, Middle River (Nov 2023)
  24. Castelion Breaks Ground on Project Ranger, Advancing Scaled Hypersonic Manufacturing in New Mexico (PR Newswire) — Castelion — Project Ranger hypersonic manufacturing campus (Jan 2026)
Related

Adjacent trackers and guides from iRecruit.co

If you are researching these builds, you are likely also sizing the construction workforce that delivers them and the operations team that runs them.

Building or running one of these programs?

iRecruit recruits the facilities, EHS, construction, manufacturing engineering, quality and supply chain leadership that turns a groundbreaking into a running factory — from project engineer to executive. A 30-minute scoping call gets you a concrete proposal within 48 hours.

Building or running one of these programs?iRecruit recruits the facilities, EHS, construction, manufacturing engineering, quality and supply chain leadership that turns a groundbreaking into a running factory — from project engineer to executive. · Aerospace & Defense Manufacturing Recruiters →
Start Hiring →or book a 15-minute intro call →