88 fab, advanced-packaging, and supplier builds across the U.S. and key global hubs — by region, status, and developer. We track every major project here; and specialize in helping owners and construction management teams recruit the cleanroom, UPW, and controls crews who deliver them.
Use the navigation below to jump directly to the regional section you want. Each section is organized by status and project type.
Five projects whose scale, complexity, and CHIPS Act anchor positioning mark them as defining builds for the 2024–2030 U.S. and global semiconductor construction cycle.
TSMC’s largest single overseas investment in company history. The Phoenix Fab 21 campus comprises three leading-edge logic fabs (N4/N3/N2 nodes) supporting customers including Apple, NVIDIA, AMD, and Qualcomm. Fab 1 began production in Q1 2025; Fab 2 and Fab 3 are in active construction with sequenced 2027–2030 ramps.
Samsung’s largest single U.S. investment. Initial fab supports advanced foundry capacity at sub-5nm nodes. Phase 2 fab announced for the same campus, with combined commitment now exceeding $44B.
Intel’s anchor U.S. CHIPS Act buildout and the centerpiece of the "Silicon Heartland" initiative. Initial two fabs support Intel’s 18A and next-generation logic processes. Master plan supports expansion to eight fabs.
One of the largest single semiconductor investments ever announced. Micron’s Central New York memory megafab campus targets four fabs over 20 years supporting DRAM production. First fab in early construction phase.
One of TI’s largest U.S. capital programs. The Sherman campus comprises four 300mm analog and embedded processor fabs (SM1 in production since December 2025; SM2–SM4 in phased delivery).
Organized by region. We track every project below; on select builds we’re actively recruiting senior PM, superintendent, MEP, commissioning, controls (BMS / Niagara), ultra-pure water, gas systems, and cleanroom-experienced roles.
Second TSMC Arizona fab. The building structure is complete and tool move-in is under way in the fourth quarter of 2026, with N3 volume production targeted for the second half of 2027.
Third TSMC Arizona fab, under construction since April 2025 and targeting N2 and A16 production by the end of the decade.
First TSMC Arizona fab in production as of Q1 2025. Initial U.S.-made leading-edge logic for customers including Apple and AMD.
Intel’s newest Arizona fab, in high-volume production on the 18A node since late 2025 for next-generation client and server logic.
Intel’s second new Arizona fab on the Ocotillo campus supporting advanced node capacity.
TSMC’s U.S. advanced packaging facility supporting CoWoS and 3D integration for AI accelerator customers.
Cluster of materials, gas, and chemical supplier plants supporting TSMC and Intel Arizona fab operations.
TSMC confirmed in July 2026 that its Arizona footprint will grow to 12 semiconductor and advanced packaging facilities, adding $100B to the original $165B commitment. Additional logic fabs target 2nm and below.
Amkor’s U.S. outsourced packaging and test campus. Phase 2, announced September 8, 2026 with an NVIDIA prepayment, lifts planned investment from $7B to about $12B; Phase 2 construction runs from late 2027 to the end of 2029, and the campus is expected to employ more than 3,500.
First fab of Intel’s Ohio One campus. The first major structural truss was installed in October 2026; Intel now expects construction to finish in 2030 with operations in 2030–2031, paced to customer demand.
Second Ohio One fab, sequenced after Fab 1. Intel’s current timeline has construction finishing in 2031 and operations starting in 2032.
Master plan expansion of the Ohio One campus supporting up to eight fabs over the long horizon.
SK Hynix’s U.S. high-bandwidth memory (HBM) advanced packaging facility supporting AI accelerator integration.
Industrial gas and chemicals supplier plant cluster supporting Intel Ohio One fab operations.
Samsung’s flagship U.S. foundry. The fab began producing Tesla’s AI5 chip on a 2nm process in the third quarter of 2026, with volume ramping into 2027.
Second Samsung Taylor fab supporting continued U.S. foundry capacity expansion.
The first of up to four connected 300mm fabs at TI’s Sherman mega-site. SM1 began production in December 2025 and is ramping to customer demand.
Second fab at TI’s Sherman site. The exterior shell is complete, with cleanroom fit-out and tool installation to follow.
The remaining two fabs in TI’s four-fab Sherman master plan, to be built as customer demand requires.
Continued expansion of TI’s Richardson 300mm fab supporting analog production capacity.
Infineon’s U.S. silicon carbide power semiconductor manufacturing site supporting EV and renewable energy power conversion.
X-FAB analog mixed-signal foundry expansion supporting specialty semiconductor production.
Applied Materials’ Austin equipment manufacturing and R&D expansion supporting semiconductor capital equipment production.
First Micron Central New York memory fab. Micron broke ground in January 2026, poured the first foundation concrete in July, and named Bechtel as its EPC partner; initial wafer output is expected in 2030.
Three additional Clay NY memory fabs in the master plan, sequenced through the 20-year horizon.
Major expansion of the GlobalFoundries Malta Fab 8 supporting specialty mixed-signal and RF semiconductor production.
GlobalFoundries was selected to operate two new New York fabs under a U.S.–Japan initiative carrying up to $21B in funding. It broke ground on the first, a roughly $10B 300mm fab, on November 13, 2026, targeting production in 2029.
Wolfspeed’s flagship silicon carbide power semiconductor fab supporting EV and renewable energy power conversion.
Edwards Vacuum’s U.S. semiconductor equipment plant supporting Micron CNY and the broader Northeast fab cluster.
National Semiconductor Technology Center pilot R&D facility expansion anchored at Albany Nanotech, supporting U.S. advanced node research.
Major expansion of Intel’s D1X campus supporting leading-edge process development and high-volume manufacturing.
Micron’s leading-edge DRAM fabs adjacent to its Boise headquarters. The first fab targets initial wafer output in mid-2027; construction of a second begins in 2026 for operation by the end of 2028.
TI’s Lehi 300mm fab expansion supporting analog and embedded processor production.
Lam Research expansion supporting U.S. semiconductor capital equipment production.
Analog Devices’ Hillsboro fab expansion supporting U.S. analog and mixed-signal production.
Pacific Northwest semiconductor supplier cluster supporting Micron and Intel operations.
onsemi’s Idaho silicon carbide power semiconductor expansion.
onsemi’s flagship U.S. silicon carbide power semiconductor fab supporting EV and renewable energy applications.
ASML’s U.S. headquarters expansion supporting EUV lithography service and R&D operations.
Entegris’ advanced semiconductor materials plant supporting U.S. fab supply chain.
Analog Devices’ Norwood headquarters and R&D campus continuing capacity additions.
Skywater specialty foundry expansion supporting domestic defense and aerospace semiconductor production (note: cross-listed Midwest/Northeast).
KLA’s metrology and inspection equipment R&D facility supporting U.S. semiconductor capital equipment innovation.
SUMCO silicon wafer manufacturing capacity expansion supporting U.S. fab supply chain.
Bosch’s U.S. silicon carbide power semiconductor manufacturing site supporting EV and clean energy applications.
Applied Materials’ flagship campus expansion supporting semiconductor capital equipment R&D and manufacturing.
Lam Research Fremont equipment manufacturing expansion supporting global wafer fabrication equipment supply.
NVIDIA’s Santa Clara HQ Voyager building expansion supporting AI/GPU R&D operations.
AMD’s Santa Clara headquarters and R&D expansion supporting CPU/GPU and AI accelerator development.
Intel’s Folsom design and R&D campus expansion supporting product engineering and validation.
Wolfspeed’s silicon carbide substrate materials plant supporting global SiC power semiconductor supply chain.
Silicon carbide substrate materials capacity expansion supporting growing SiC fab demand.
Specialty semiconductor materials production supporting U.S. and global fab supply chain.
JSR photoresist manufacturing expansion supporting advanced lithography materials supply.
Vishay’s discrete semiconductor fab expansion supporting U.S. power device production.
Micron is modernizing its Manassas fab to bring 1-alpha DRAM production onshore as part of its roughly $200B U.S. plan. The company reported its first 1-alpha DDR4 production starts there in 2026.
Hemlock polysilicon manufacturing expansion supporting U.S. semiconductor and solar PV supply chain.
Polar Semiconductor’s Minnesota specialty foundry expansion supporting analog and mixed-signal production.
Coherent’s silicon carbide substrate materials capacity expansion in Pennsylvania.
Coherent specialty semiconductor and laser materials manufacturing expansion.
Microchip’s Colorado Springs fab expansion supporting analog and embedded controller production.
NSTC pilot R&D facility supporting advanced semiconductor research adjacent to TSMC and Intel Arizona operations.
TSMC’s European Semiconductor Manufacturing Company joint venture fab supporting automotive and industrial semiconductor demand.
Intel’s flagship Israel Fab 38 expansion supporting global advanced node logic production.
Bosch’s Dresden semiconductor manufacturing campus including SiC and silicon production for automotive applications.
Infineon’s Dresden mega-fab expansion supporting power and analog semiconductor production.
ST/GlobalFoundries joint venture 300mm fab in Crolles supporting European specialty semiconductor production.
ST’s Catania silicon carbide fully-integrated manufacturing site supporting global SiC supply chain.
NXP’s European R&D and specialty production campus expansion.
ASML’s flagship Veldhoven headquarters and EUV equipment production expansion.
Siltronic 300mm silicon wafer manufacturing capacity supporting global fab supply chain.
X-FAB’s Erfurt specialty foundry expansion supporting analog and mixed-signal European production.
imec’s leading-edge R&D and pilot line expansion supporting global semiconductor research collaboration.
Silex MEMS foundry expansion supporting global sensor and microsystem device production.
TSMC’s flagship Hsinchu campus continued buildout supporting 2nm production and beyond.
TSMC’s Japanese mega-fabs supporting automotive and industrial semiconductor demand in partnership with Japanese OEMs.
Samsung’s flagship Korean Pyeongtaek mega-campus phases 4 and 5 supporting memory and foundry capacity expansion.
Samsung’s announced Yongin mega cluster supporting up to five advanced semiconductor fabs over the long horizon.
SK Hynix’s Yongin memory cluster expansion supporting DRAM and high-bandwidth memory production.
Micron’s Hiroshima fab expansion supporting EUV-enabled DRAM production for global supply.
Micron’s Taichung memory and HBM advanced packaging expansion.
Rapidus’s 2nm gate-all-around logic fab anchoring Japanese government-supported advanced semiconductor manufacturing return.
Kioxia/WD joint venture NAND flash production expansion supporting global storage demand.
VIS/NXP joint venture 12-inch wafer fab in Singapore supporting analog and mixed-signal production.
UMC’s Singapore 22/28nm fab expansion supporting Asian specialty foundry demand.
GlobalFoundries Singapore expansion supporting specialty foundry demand including automotive and IoT.
ASE’s Taiwan advanced packaging expansion supporting global AI accelerator integration capacity.
Resonac semiconductor materials production expansion supporting Japanese and global fab supply chain.
Every project shown is compiled from public filings, CHIPS Act disclosures, company announcements, regulatory disclosures, and our own placement work across the segment.
To appear in the tracker, a project must meet at least three of the following criteria:
The tracker is maintained by iRecruit.co’s research team in coordination with our active placement work across the segment. Verify all data before referencing in formal documents. Project specifics ($ figures, fab counts, GC assignments, timelines) may have evolved — several CHIPS Act-anchored projects are subject to ongoing policy review.
If you’re researching semiconductor construction projects, you’re likely also evaluating the workforce, cleanroom and ultra-pure water expertise, and process-engineering realities that shape execution on fab builds.
iRecruit.co’s specialty recruiting practice for senior semiconductor and high-tech industrial construction roles.
The closest sector parallel: extreme MEP density, controls fluency, BMS integration, and project-cadence discipline.
NICET, NETA, BCxP, CDCPM, PMP and PE — the credential stacks employers screen for on fab builds.
iRecruit.co recruits the project managers, superintendents, MEP coordinators, controls engineers, cleanroom specialists, ultra-pure water / gas systems leads, and commissioning agents who deliver builds like these. 30-minute scoping call gets you a concrete proposal within 48 hours.