October 14, 2026

Iowa Data Center Construction Jobs 2026: Guthrie County & Pay

Updated
By:
Dallas Bond

As of October 14, 2026, I found no confirmed data center construction openings in Guthrie County in the supplied sources. Before you apply, check the exact jobsite and whether the posting is still active - not just its Iowa location label.

Looking for your next project? Register with iRecruit — one profile, matched to mission-critical builds nationwide.

I compare six role groups below, using listings in Des Moines, Cedar Rapids, Iowa City, and Iowa travel assignments. Statewide projections of nearly 8,600 construction jobs are estimates, not current vacancies.[7]

Quick Comparison

Role group Listed Iowa locations Advertised base pay
Construction superintendents Cedar Rapids; Des Moines $140,000–$268,200/year[8][9][12]
Construction project managers Urbandale/Des Moines; Cedar Rapids $89,250–$200,000/year; upper range estimated[6][15][16]
Electricians Cedar Rapids; Iowa travel assignments Up to $57–$64/hour, depending on the listing[21][22][23]
Electrical and E&I superintendents Iowa City; Cedar Rapids/traveling projects $92,000–$200,000/year[24][28]
Commissioning specialists and managers Des Moines; Cedar Rapids; other Iowa assignments Listed salaried roles: about $120,000–$220,000/year; no verified hourly specialist rate[30][31][35]
Specialty systems and MEP superintendents Des Moines; Cedar Rapids $111,400–$195,200/year, depending on the requisition[9][12][37][38]

These are regional pay comparisons - not Guthrie County job offers. I keep <u>base pay separate from overtime, bonuses, and per diem</u>, then compare experience, licenses, systems knowledge, and travel requirements.

My advice: use the ranges to narrow your search, then confirm the employer’s live posting, schedule, lodging, allowance rules, and application route. Get pay and travel terms in writing before accepting an assignment.

Iowa Data Center Construction Pay: 2026 Role Comparison

Iowa Data Center Construction Pay: 2026 Role Comparison

1. Construction Superintendents

Location and Hiring Status

The sources list no verified superintendent openings in Guthrie County. They show Mortenson’s General Superintendent - Data Center Construction role in Cedar Rapids and Boldt’s MEP Superintendent and Specialty Systems Superintendent roles in Des Moines.[8][9][12] Check with the employer to confirm that the position is still open before applying.

Base Pay and Allowances

Mortenson’s role covers multiple projects or large, complex projects. Boldt’s roles focus on specific systems.[8][9][12]

Employer and role Posted location Annual base pay
Mortenson - General Superintendent Cedar Rapids $178,800–$268,200[8]
Boldt - MEP Superintendent Des Moines $140,000–$170,000[9]
Boldt - Specialty Systems Superintendent Des Moines $140,000–$170,000[12]

Mortenson posts the highest base-pay range, while Boldt’s system-focused roles offer lower ranges. These figures cover base pay only; overtime and per diem are separate.

Responsibilities and Qualifications

Compare the pay with the experience required. Mortenson’s senior general-superintendent role calls for about 14 years in construction management or 10 years in the trades.[10]

Travel and Application Requirements

Apply through the employer’s careers page. Verify the requisition number, posted location, pay range, and closing date. Mortenson’s Cedar Rapids general-superintendent listing uses requisition 22530.[8][10] Get the assignment type, reporting location, and travel terms confirmed in writing.

Next, compare project manager roles, where pay reflects oversight and schedule control rather than site supervision.

Hiring for a mission-critical build? Get a pre-qualified shortlist.

iRecruit.co specializes in construction recruiting for data center, energy, and advanced-manufacturing projects — project managers, MEP coordinators, commissioning leads, and more. We pre-screen every candidate so only qualified professionals reach your hiring team.

Get Started

Success-based pricing · 90-day replacement credit · No upfront fee on single roles

2. Construction Project Managers

Location and Hiring Status

No Guthrie County project-manager opening is confirmed. Verified Iowa postings are in Urbandale/Des Moines and Cedar Rapids. A “remote” label doesn’t make either one a Guthrie County job.[6][16][15] The senior hyperscale project-manager role in Cedar Rapids required local candidates or relocation.[15]

Base Pay and Allowances

Use these pay ranges as reference points, not job offers. Cupertino Electric lists annual performance-bonus eligibility separately from base pay. The available listings don’t verify overtime or per diem.[6][16][15]

Role Location Annual base pay Bonus and allowances
Cupertino Electric - Project Manager - Data Center Construction Urbandale/Des Moines, Iowa, or remote $89,250–$170,000[6] Eligible for an annual performance bonus; no verified overtime or per diem[6]
Insight Global - Senior Project Manager - Hyperscale Data Center Construction Cedar Rapids $150,000–$200,000 estimated[15] Benefits from day one and a 401(k) employer match listed; relocation and travel details need confirmation[15]
IES Communications - Project Manager Data Center Cedar Rapids $90,000–$140,000[16] No verified overtime, per diem, or travel allowance in the available listing[16]

Salary.com’s Iowa construction-project-manager benchmark is $113,551 on average, with a typical middle range of $104,795–$124,745. That’s a salary benchmark - not an opening.[14]

Responsibilities and Qualifications

Like the superintendent roles, these jobs are regional options, not confirmed Guthrie County openings. Project managers shift from daily field oversight to cost and schedule control, contracts, procurement, and project delivery.

Cupertino Electric seeks a bachelor’s degree in construction management, business, engineering, or a related field, plus about five years of leadership on multi-million-dollar electrical construction projects.[6] Tailor your résumé to show contract scope, project value, delivery dates, team size, and measurable cost or schedule results.

Travel and Application Requirements

Apply through Cupertino Electric’s careers page using the exact title Project Manager - Data Center Construction. Before submitting, verify the posting, work site, and travel terms.[6] Confirm which site controls the assignment, whether remote work is available, and how often you’ll need to travel.

Get bonus, overtime, per diem, lodging, mileage, relocation, and assignment terms in writing. Don’t count unconfirmed allowances as salary. Save a copy of the posting so you can check the pay and location details later.

Next, compare these manager ranges with electrician hourly pay and overtime.

Data center company announces $5 million grant to boost workforce in Iowa

3. Electricians

For electrician roles, compare hourly pay, overtime, and per diem rather than salary alone.

Location and Hiring Status

The supplied listings do not confirm an electrician vacancy in Guthrie County. The listed Iowa jobs are outside the county, so treat local demand as projected until a recruiter confirms a local opening.[18][19][20]

Recent examples include a Cedar Rapids data-center assignment from Kodiak Labor Solutions and an Iowa opening from Finish Line Staffing.[22][23]

Ask the recruiter whether these jobs are still available. Use the listings only as pay benchmarks.[21][22][23]

Base Pay and Allowances

Compare base pay, overtime, and per diem separately - not as one pay figure.

Advertised role Hourly base pay Overtime Per diem
Kodiak Labor Solutions - Cedar Rapids; July 2026 $60 Not specified $150/day for qualified travelers[22]
Licensed journeyman data-center listing - Iowa; September 2026 Up to $57 $85.50/hour after 40 hours; 68-hour week advertised $178/day; confirm whether it applies seven days a week and on travel days[21]
Finish Line Staffing - Iowa; July 27, 2026 start or as soon as available Up to $64 Not specified in the cited listing $175/day for qualified travelers[23]

Per diem is an allowance, not wages. Your weekly take-home depends on hours worked, overtime eligibility, taxes, travel costs, and how many days the allowance is paid.[18][19] Also check the work scope and license requirements.

Responsibilities and Qualifications

Ask whether the data-center work includes conduit, cable tray, feeders, grounding, switchgear, transformers, UPS units, generators, medium-voltage work, testing, and energization support.[18]

Iowa requires the correct electrical license or supervision. General construction experience alone isn't enough.[17] Separately, check requirements for OSHA-10 or OSHA-30, CPR/first aid, NFPA 70E, arc-flash, aerial-lift, and forklift credentials.

Travel and Application Requirements

Apply through the employer or staffing portal. Before submitting documents, verify the job title, site, pay, per diem, overtime, duration, schedule, lodging, mileage, parking, tools, and license requirement.[18][19]

Include your license status, commercial project history, equipment experience, testing skills, safety credentials, and willingness to travel. Ask who qualifies as a traveler, whether per diem is paid on days off, and whether lodging costs come out of the allowance.[18][19][22][23]

4. Electrical and E&I Superintendents

Location and Hiring Status

No Guthrie County vacancy is confirmed. Jacobs’ E&I Superintendent - Data Centers posting in Iowa City offers an Iowa comparison. Demand in Guthrie County remains projected unless an employer confirms a local site.[28]

These roles help you compare specialized electrical supervision with the broader superintendent pay ranges above.

Base Pay and Allowances

Published role Advertised location Annual base pay Separate allowances
Jacobs - E&I Superintendent, Data Centers Iowa City $92,000–$126,500 Not specified[24][28]
Jobot - Electrical Superintendent, Data Center Cedar Rapids; traveling projects $160,000–$200,000 $1,800/month travel per diem plus $180/day food per diem, subject to employer policy[24]

Compare base pay separately from overtime, lodging, and per diem. Check travel requirements and allowance eligibility. The higher advertised salary comes with traveling-project expectations; it is not a verified Guthrie County base wage.[24]

Responsibilities and Qualifications

Electrical and E&I superintendents focus on electrical crews, subcontractors, materials, schedules, quality, and energization rather than general site supervision. E&I roles also cover instrumentation, so check which systems each posting includes.[25][26][27]

EPI Power’s Cedar Rapids role requires at least eight years of project-superintendent experience, electrical expertise, schedule coordination, and skill with common office software. English-Spanish communication is a plus.[25] Duties can include reviewing drawings and one-line diagrams, checking National Electrical Code compliance, and preparing systems for energization and turnover.[25][26][27]

Travel and Application Requirements

Apply through the employer’s careers page or verify that the recruiter’s posting is current. EPI Power may require travel or relocation and typically works Monday through Saturday.[25] Confirm travel requirements and assignment length in writing. Verify the actual jobsite - not just the recruiting city - before applying.[29]

5. Commissioning Specialists and Managers

Commissioning follows electrical and E&I installation. It checks that systems work before turnover.

Location and Hiring Status

The supplied sources show no verified commissioning opening in Guthrie County. Listed Iowa roles are in Cedar Rapids and Des Moines, so local demand remains projected.[35][36]

Base Pay and Allowances

Listed opportunity Advertised annual base pay Separate compensation
CAI Mission Critical commissioning role - Des Moines Approximately $128,300–$150,800[31] Not specified
Owner’s-representative commissioning manager - Cedar Rapids $160,000–$220,000[35] Per diem; amount unspecified[35]
Another Iowa commissioning-manager posting $120,000–$200,000[30] Discretionary 10%–20% bonus; $2,500–$4,000 monthly travel/relocation allowance[30]

The sources do not provide a verified hourly specialist rate. Before comparing contract offers, ask about the regular rate, overtime multiplier, and minimum hours, along with travel reimbursement, lodging, mileage, and per diem.[30][35]

Responsibilities and Qualifications

Commissioning specialists check installations, run functional tests, close out deficiencies, and prepare turnover records for Iowa data centers. Mission-critical project turnover requires test procedures, checklists, start-up records, deficiency logs, and final reports.[34]

Commissioning managers lead the process through turnover. They coordinate schedules, teams, contractors, third-party agents, and client communication. Cedar Rapids manager postings ask for 8 years of commissioning experience or a bachelor’s degree plus 7 years in construction or commissioning, including 5 years in data centers or other mission-critical facilities.[32][33][35]

Travel and Application Requirements

Apply through the employer’s careers or recruiting page.[32][33] Focus your résumé on functional testing, deficiency closeout, turnover documentation, and mission-critical systems experience.

Before submitting, confirm the site, hiring status, employment type, travel expectations, assignment duration, and security requirements. Also check whether the role involves weekend testing and whether lodging, mileage, per diem, or relocation is included.[30][32][33][35]

A future Guthrie County project may still require travel. Commissioning personnel may be mobilized from Cedar Rapids, Des Moines, or outside Iowa.[33][35]

Next, compare these commissioning ranges with specialty systems and MEP superintendent pay.

6. Specialty Systems and MEP Superintendents

Location and Hiring Status

These roles connect electrical installation with commissioning. Verified Iowa postings include Boldt’s MEP Superintendent and Specialty Systems Superintendent roles in Des Moines, plus Mortenson’s MEP Superintendent role in Cedar Rapids.[9][12][37][38] None confirms a Guthrie County jobsite. Treat county demand as projected unless a posting names a specific site.[40]

Base Pay and Allowances

Boldt lists annual base pay of $140,000–$170,000 for both roles.[9][12] Mortenson lists two annual base ranges: $111,400–$167,100 and $130,100–$195,200. Check the specific requisition to see which range applies.[37][38]

These figures cover base salary only. The listings do not state overtime, per diem, lodging, bonuses, or benefits.[9][12]

Responsibilities and Qualifications

MEP superintendents coordinate work from installation through commissioning and turnover. That includes equipment installation, utility tie-ins, trade sequencing, and keeping work on schedule.[9]

Specialty systems superintendents focus on BAS/BMS, EPMS, DAS, security, telecommunications, and fire alarm interfaces with mechanical, electrical, plumbing, and fire protection systems.[9][12]

Typical requirements include 7–10 years of relevant construction experience and prior supervision. Degree and trade experience requirements vary by posting.[37][38][13] On your résumé, put numbers behind your work: trade-package values, subcontractor headcounts, and coordination fixes.

Travel and Application Requirements

Apply through the employer’s careers page and confirm the exact title and current hiring status. Before accepting an assignment, verify the worksite, assignment length, travel percentage, rotation schedule, and written overtime and allowance terms.[37][38][39]

Next, compare these superintendent ranges with base pay, overtime, and allowances by role.

Pay by Role: Base Pay, Overtime, and Allowances

These Iowa pay ranges are comparison data - not confirmation of Guthrie County openings. Start with base pay, then compare overtime, per diem, and travel payments separately. Use the ranges to assess a future county offer before reviewing qualifications, travel terms, and application steps.

Role group Location Base pay Overtime Travel/lodging Per diem
Construction superintendents Cedar Rapids - verified listing Data-center superintendent: $90,000–$125,000/year[43] - - -
Construction project managers Cedar Rapids - verified listing Eaton hyperscale project manager: $97,000–$143,000/year[42] - - -
Electricians Cedar Rapids - verified listing Workify data-center journeyman electrician: $57/hour with an active Iowa license; $50/hour while reciprocity is pending[41] - - $178/day when work requirements are met[41]
Electrical and E&I superintendents Iowa listing; exact worksite not confirmed Jobot electrical superintendent: $160,000–$200,000/year[28][24] - Reported: up to $1,800/month for travel; verify terms[24] Reported: $180/day for food; verify terms[24]
Commissioning manager Iowa; exact site not disclosed Edison Smart commissioning project manager: $140,000–$160,000/year[44] - - -
Specialty systems and MEP superintendents Des Moines - verified listings MEP superintendent / specialty-systems superintendent: $140,000–$170,000/year[9] - - -

“ - ” means not disclosed.

Listings that cover several roles can make pay harder to compare. Use only the wage, hours, and per diem stated for each role. Don’t combine electrician pay, commissioning pay, or travel allowances into one total.

Request a dated posting and a written pay breakdown before comparing offers. Confirm tax treatment, lodging arrangements, and whether “up to” amounts depend on receipts or qualifying travel days. Before applying, check the pay alongside license requirements, travel rules, and the posted worksite.

Job Requirements, Travel Terms, and How to Apply

Use the pay comparisons above to narrow your search to postings that fit your experience and willingness to travel. Guthrie County remains unconfirmed. The table below separates verified openings from recruiting channels.

As of October 14, 2026, a sourced Iowa listing does not guarantee a live opening. Confirm the worksite, hiring status, and pay structure. Then check your qualifications against the individual posting - not just the job title.

Role group and status Required vs. preferred experience Stated credentials and systems Application route
Construction superintendents - verified opening At least 6 years in a similar role; data-center, industrial, or commercial experience preferred.[24] Electrical-systems knowledge, cost control, and familiarity with Procore, PlanGrid, Bluebeam, Accubid, or comparable software.[24] Apply through the superintendent posting; confirm availability and worksite.
Construction project managers - verified recruiting channel Proven project delivery history in mission-critical construction; exact years not stated.[47][48] Specific credentials and systems not stated. Apply through iRecruit.co.[45][46]
Electricians / electrical foremen - verified Iowa traveling posting Match your electrical or industrial experience to the employer’s criteria.[11][49] License, union, and OSHA requirements not stated in the cited results; verify directly.[11][49] Apply through the employer’s posting; travel terms vary by posting.
Electrical and E&I superintendents - verified openings One posting requires 6+ years in a similar role; another requires 10+ years in electrical construction on mission-critical, data-center, industrial, or large-commercial projects.[24][51] One lists electrical-systems knowledge, cost control, and Procore, PlanGrid, Bluebeam, Accubid, or similar software; no separate E&I credential is stated.[24] Apply through each posting; do not combine requirements from separate listings.
Commissioning specialists/managers - verified manager opening The manager listing requires a mechanical- or electrical-engineering degree.[50] CxA or BCA certification and OSHA 30 required; software and BMS requirements not stated.[50] Apply through the manager posting and verify its credential requirements.
Specialty-systems and MEP superintendents - verified recruiting channel Proven project delivery history is the main fit factor; exact years not stated.[47][48] Specific licenses, OSHA training, union status, and systems requirements not stated. Apply through iRecruit.co.[45][46]

A location label is not a travel promise. Ask for assignment length, rotation, relocation, lodging, and paid travel time in writing.

Before applying, check the worksite, posting status, required versus preferred experience, certifications, pay components, travel terms, work authorization, and sponsorship policy. Record the data center construction project scope, systems, and crew responsibilities where relevant.

For active roles that match your qualifications, compare the full offer details before applying. Use the posting title, employer, location, and date to check whether the application is for a live opening or a general candidate pool.

Conclusion: Compare Job Location and Pay Before Applying

No active Guthrie County opening is verified in the available evidence as of October 14, 2026. Listings in nearby cities are regional benchmarks, not confirmed local openings.[52][43][28] For every role, check the exact worksite first, then pay.

Compare jobs within the same role group - not just by advertised pay. For superintendent roles, compare openings in Cedar Rapids and Des Moines. Electricians should compare licensed journeyman jobs or travel assignments. Commissioning candidates should compare commissioning, E&I, controls, or startup roles.[52][43][12][19][28] Project managers and MEP candidates should verify the exact title, employer, and reporting location.

Compare base pay before overtime and per diem. Electrician rates of about $54–$65 per hour exclude both overtime and per diem.[19] A Cedar Rapids electrical-superintendent listing reports $160,000–$200,000 annually, plus up to $1,800 per month in per diem, listed separately from base pay.[28]

Check whether the worksite, required qualifications, and travel schedule fit - not just whether the pay package looks attractive. Before applying through a live employer posting, confirm pay and travel terms in writing.

FAQs

How can I track new Guthrie County data center openings?

Contact iRecruit.co with your résumé, target role, relevant experience, project background, and preferred locations [1].

Data center construction roles often call for specialized talent, and employers fill these positions through pre-qualified talent pools [2]. Sharing your goals helps iRecruit.co match you with openings that fit your industrial, utility, or mechanical background as projects enter the hiring phase [3][1].

How do I compare offers with different overtime and per diem terms?

Compare the full compensation package - not just base pay. Bonuses, overtime, and per diem can add 20% to 40%. Keep guaranteed base pay separate from earnings that depend on meeting certain conditions [1].

Get these terms in writing:

  • Employment status and overtime: Exempt or nonexempt classification and overtime eligibility.
  • Per diem and travel: Rates, eligible days, tax treatment, and limits for lodging, mileage, and flights.
  • Bonuses: Targets, eligibility, payment dates, and clawbacks.

If any terms are missing, mark them as undisclosed instead of assuming a value [1].

Can my commercial construction experience qualify me for data center work?

Yes, though employers often prefer direct data center experience [1][2]. They also hire candidates whose skills carry over from semiconductor fabrication, pharmaceutical manufacturing, healthcare, power utilities, and industrial plants [3][4][5].

Highlight projects that involved phased delivery, complex mechanical, electrical, and plumbing (MEP) coordination, quality assurance and quality control (QA/QC), or work in operating facilities. Hospital and industrial projects can show that you know how to meet similar technical requirements and keep facilities running [3][4][5][2].

Related Blog Posts

Keywords:
Iowa data center jobs, data center construction pay, Guthrie County jobs, construction superintendent pay, commissioning manager Iowa, electrician per diem Iowa, MEP superintendent salaries, project manager data center
Free Download

Data Center Construction Labor Trends in 2026

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

More mission critical construction news

Data Center General Superintendent: Traveler vs. Local
November 28, 2026

Data Center General Superintendent: Traveler vs. Local

Compare traveling vs local data center superintendents—coverage, total cost, continuity, and assignment terms for reliable on-site leadership.
CDCPM Prerequisites for Data Center Construction PMs
November 28, 2026

CDCPM Prerequisites for Data Center Construction PMs

Summarizes CDCPM enrollment rules, course format, assessment expectations, and how construction PM experience aligns with the syllabus.
Chicago Data Center Electrical Superintendent Jobs: Pay and Skills
November 28, 2026

Chicago Data Center Electrical Superintendent Jobs: Pay and Skills

Clear pay ranges, required skills, and licensing for Chicago data‑center electrical superintendents across hyperscale and colocation roles.
Data Center Construction Careers 2026: Entry Roles and Pay Paths
November 28, 2026

Data Center Construction Careers 2026: Entry Roles and Pay Paths

Compare four entry roles in data center construction—project, field, assistant superintendent, and MEP coordinator—with pay, travel, and advancement.