Vetted SpecialistsExample profileSunita N.Data Center Electrical SuperintendentRan electrical scope on a 96 MW two-building campus — 34.5 kV service, 12 unit substations, 2N distribution, 48 gen-sets — energized on the baseline scheduleWrote the energization and NETA acceptance-testing sequence for 60+ pieces of switchgear with phased hall turnover and live gear adjacent to constructionLed 280-electrician peak across self-perform crews and three subs with an NFPA 70E permit program and zero energized-work incidentsMaster ElectricianMV terminationsNETA coordination
Vetted SpecialistsExample profileAndre A.Fab and Gigafactory Electrical SuperintendentElectrical super for a 1.4M SF fab shell and subfab — 9 miles of cable tray, 138 kV substation interface, and tool-hookup power across 400+ process toolsSequenced gear-room turnover and busway energization to release cleanroom tool-install zones two weeks ahead of the owner’s scheduleCoordinated with the mechanical super to resolve tray, duct and process-piping conflicts through BIM clash reviews before fabricationCable tray at scaleTool hookupBIM coordination
Vetted SpecialistsExample profileKavita N.Launch Site and Defense Electrical SuperintendentRan MV distribution, gen-set backup and UPS installs for a launch pad and propellant-loading complex under Class I Div 2 and range-safety rulesManaged pad-power energization sequencing against active launch windows with cryogenic and hydrogen line setbacksDelivered cleared-site electrical scope on a MILCON test facility with badge-and-escort controls and a 0.0 recordable rate over 18 monthsHazardous locationsGen-set and UPSCleared site