DPR Construction, Turner Construction, Holder Construction, HITT Contracting, and Whiting-Turner are five data center general contractors to evaluate in 2026. The best fit depends on completed projects like yours - and the people assigned to the job - not company size alone.
This comparison reviews project scale, geographic reach, hyperscale and colocation work, electrical and mechanical coordination, commissioning support, and schedule performance. Before award, check at least three comparable projects, named staff, and equipment delivery commitments.
Quick Comparison
Figures reflect different scopes and are not a performance ranking. Information is current through November 19, 2026; planned capacity is not completed capacity. Each contractor’s commissioning support should also be distinguished from the owner’s independent commissioning role.
How to Choose a Data Center General Contractor in 2026
DPR’s data center track record rests on documented mission-critical work - not publicly reported data-center-only revenue.
Mission-critical work accounted for 31% of DPR’s company revenue in 2024. DPR does not publicly report data-center-only revenue.[14]
Vantage WA13 in Quincy, Washington, was delivered in five phases on a 17-acre site; the first three phases added 40 MW of IT capacity, and phases four and five added 24 MW for a total of 64 MW.[9]
At Meta’s Richland Parish, Louisiana campus, DPR is part of a joint venture with Turner Construction and Mortenson and reports about 2 million square feet of scope on the roughly 4-million-square-foot campus. Construction began in late 2024, with operations expected by 2030.[8][11][12]
At Richland Parish, DPR reports self-performing all concrete work and using prefabricated exterior skin panels and off-site assemblies that combine mechanical, electrical, and plumbing (MEP) systems. Its scope also includes modular electrical rooms and modular critical utility plant systems.[11][12][13]
The project documents DPR’s role in an AI hyperscale campus, but public descriptions do not specify rack density, cooling configuration, or redundancy details. Owners should check those details with project references.[8][11][12]
Execution also needs close review as work moves into energization, commissioning, and turnover.
DPR reports delivering the final 24-MW phase at Quincy on time, with zero recordable incidents, after more than 618,400 work hours over 16 months.[9][10]
Owners should check phase-by-phase energization dates, commissioning gates, site leadership, critical-trade staffing, and long-lead equipment plans. Confirm which scopes DPR will self-perform, and request evidence for any claimed schedule savings. Use those same checks when reviewing the next contractor profile.
Turner reported $29.2 billion in 2025 revenue, with data centers making up approximately 37% of its year-end backlog.[16] Its technology group handles edge, enterprise, hyperscale, and colocation projects.[17] Turner also reports hyperscale programs across North America, Europe, and Asia.[16] That backlog points to a deep pipeline, but delivery on individual projects matters more.
Serverfarm TOR2.1: Turner lists Serverfarm TOR2.1 in San Jose, California, as a data center designed for an 8 MW total critical load with a 4 MW data hall build-out focused primarily on second-floor development.[15][20] The available records do not disclose the completion date, construction value, or Turner’s exact contractual role.
Equinix IL04.1, Istanbul: Turner provided project-management services for Equinix IL04.1 in Istanbul, Turkey. The facility includes 3,000 square meters of white space, an initial 5.4 MW IT load, and scalability to 6.48 MW.[21]
The Istanbul project shows project-management experience on a technically complex build - not a confirmed general-contractor role. Owners should check how that experience carries over to commissioning discipline and field execution.
TOR2.1’s listed equipment includes transformers, switchgear, generators, UPS units, and chilled-water cooling systems.[15][18] Coordinating these systems makes MEP coordination a central part of delivery. The available descriptions do not disclose commissioning responsibilities or performance results.
Turner’s reported pipeline includes major equipment ordered for delivery as late as 2027, showing why long-lead electrical and mechanical procurement needs close attention.[19] Ask Turner to name the project executive, MEP lead, commissioning lead, and BIM/VDC lead responsible for mission-critical execution. Request equipment release dates and delivery commitments, too. Company scale alone doesn’t tell you who will lead the job.
Apply the same checks to the next contractor: project role, critical-systems coordination, commissioning support, and schedule control.
Holder reports more than 610 data and telecommunications projects, $76 billion in project volume, 12.9 GW in portfolio capacity, and more than 6.4 GW delivered in the United States. These are separate measures - not annual revenue.[23] What matters next is how that experience translates into field execution on specific hyperscale jobs.
Aligned PHX-06: October 2026 coverage identifies Holder as general contractor for a 457,000-square-foot hyperscale project on 26 acres. Prefabricated and modular components allowed wall fabrication to overlap with foundation and structural work, and trailer-mounted hydronic heating enabled early chiller commissioning while electrical work continued. The source does not report contract value or schedule savings.[26]
That project makes Holder’s self-perform work and commissioning practices worth checking closely.
Holder’s documented work includes projects for Google, EdgeCore, and STACK Infrastructure.[24] These examples show repeat work with major owners, not proof that every project finished on time. Owners considering Holder should request references that confirm its exact scope, completed phases, change-order history, and turnover results.
Holder lists estimating, design assistance, equipment purchasing, procurement planning, operational support, and commissioning coordination among its services.[22] Its self-perform capabilities include structural concrete, rough carpentry, hot-aisle containment, modular wall systems, site maintenance, and site safety systems. Confirm which are available for your project.[25]
Require a scope-by-scope labor commitment. Also request a responsibility matrix that spells out who handles MEP integration, startup, integrated systems testing, and operator training.
Evaluate the assigned team, not just Holder’s portfolio. Require comparable-project histories and time commitments for the project executive, superintendent, MEP manager, commissioning lead, procurement lead, safety manager, and key trade partners.
Request a baseline schedule, milestone definitions, procurement schedule, staffing curve, utility dependencies, phased-turnover criteria, and recovery plan.
The next contractor offers a different mix of self-perform depth, national reach, and mission-critical staffing.
HITT is a national contractor based in Northern Virginia, with experience across the Southeast, Texas, the Pacific Northwest, and the Southwest.[5] ENR reported $3.78 billion in 2025 Texas and Southeast revenue, including about $2.69 billion, or 71%, from telecom. Those figures cover regional work - not companywide revenue or data centers alone.[29]
Its portfolio includes hyperscale, colocation, enterprise, telecom, and network operations center projects. Services span greenfield construction, fit-outs, occupied-facility work, MEP, and commissioning.[5]
For owners, the question is whether that reach translates into repeatable delivery on complex critical systems.
PDX12, Hillsboro, Oregon: HITT reports completing the 560,000-square-foot operating data center campus in 2022 with 48 MW of critical capacity after a 15-month schedule. Limited staging space, parking coordination, and local-stakeholder constraints added complexity.[27]
Project Temple, Texas: HITT is delivering Rowan Digital Infrastructure’s 300-MW hyperscale campus on 700 acres, with a $700 million minimum investment and substantial completion targeted for 2027.[28]
PDX12 shows why site logistics deserve close review when checking schedule certainty. Across live-facility and hyperscale projects, owners should also examine staffing, commissioning, and turnover practices.
Sterling II, Virginia: HITT reports completing this 225,000-square-foot, 22.5-MW facility in 180 days. Double shifts supported shell construction, while data-hall fit-out ran around the clock. More than 200 equipment units included off-site-fabricated power and cooling systems; temporary power allowed commissioning to begin before permanent utility service was available.[30]
Request the quality plan, inspection and test plans, nonconformance log, commissioning records, and a sample digital handover package. Public information does not disclose project-specific turnover durations or deficiency counts. Confirm how testing on temporary power transitions to final testing on permanent power.[5]
Check whether the proposed local team can repeat these delivery methods under live-project constraints. Confirm each lead’s role on comparable projects, current workload, and availability.
Require a resource-loaded schedule that shows staffing by phase, trade, shift, and location. It should include peak craft labor, supervision ratios, night-shift coverage, commissioning personnel, and turnover support.
Ask for staffing evidence from comparable current projects. Identify who has the authority to add labor, resequence work, and resolve procurement issues.
Whiting-Turner ranked No. 6 in BD+C’s 2025 data center contractor ranking, with $2.49 billion in 2024 data center revenue.[1] Its published portfolio covers the Mid-Atlantic, Mountain States, Southeast, and South Central regions.[34][36]
That footprint supports national reach, but it doesn’t confirm local experience. Check whether the proposed team has delivered similar work in your region using your delivery model.
Public projects include greenfield construction and renovations in live facilities.[31][35]
University of Florida East Campus Data Center: The Tier III facility includes 10,000 square feet of computing space, 4,400 square feet of standby administrative space, and a central utility plant with 2.5 MW of generator capacity and N+1 cooling and electrical redundancy.[31] Whiting-Turner also reports completing infrastructure upgrades for HiPerGator 2.0 without interrupting data-hall operations.[31] Confidential warehouse conversion: The team converted a 54,000-square-foot tilt-up warehouse into a data center with 23,000 square feet of data-center floor, 10,000 square feet of electrical rooms, and 10,000 square feet of office space. It used 3D modeling for all MEP work and equipment, including future infrastructure, to preserve expansion capacity.[32]
These projects show mission-critical experience with redundancy, live operations, and expansion-ready design. Owners still need references that address hyperscale size, turnover, and schedule control. Match those references to your project’s size, occupancy status, and commissioning risk.
The test is how the team coordinates these systems in the field. Whiting-Turner says its mission-critical practice covers design coordination, BIM/VDC, MEP coordination, procurement, prefabrication, redundancy, and commissioning.[34] The warehouse conversion illustrates its use of 3D modeling to plan MEP work and future infrastructure.[32]
Owners should assign responsibility in the contract for test-script preparation, deficiency closeout, and integrated systems testing rather than assume those tasks are covered.[32][33]
Verify the local office and named team before relying on the national portfolio. Public sources do not disclose a standard staffing model or schedule-performance baseline.[33][34]
Request the project executive’s experience and the superintendent’s record on comparable projects. Identify the MEP manager, BIM/VDC lead, commissioning manager, and scheduler. Also ask for regional references, committed electrical and mechanical trade capacity, and equipment-release dates tied to energization milestones.
Use these checks for the side-by-side comparison below.
The profiles above outline each firm’s track record. The tables below distinguish documented work from reported claims and details that still need checking. For mission-critical work, focus on completed comparable projects, critical-systems coordination, commissioning support, and schedule certainty.
These figures use different years, sources, and categories. They are not directly comparable.
A Southeast listing puts telecommunications revenue shares at 40% for DPR, 20% for Turner, 74% for HITT, and 17% for Whiting-Turner. These are shares of regional revenue, not national data-center shares.[38] They do not establish local delivery capacity.
Planned campus capacity is not the same as completed project capacity. The table keeps those measures separate.
Technical fit rests on completed comparable work - not capability statements alone. The table separates documented scope from details that need checking, including package boundaries and delivery methods.
The contractor coordinates installation, testing, corrective work, and documentation. The independent commissioning authority provides impartial verification within its contracted scope. Contractor-managed testing does not count as independent verification or acceptance.
A schedule needs more than target dates behind it. Look for named personnel, committed trade capacity, and verified handover records.
Request the baseline schedule, critical-path changes, equipment releases, change orders, safety logs, commissioning logs, and signed handover records.
The matrix below rates evidence strength, not quality. D = documented; V = verify.
The profiles above document contractor experience. Use the table below to turn that evidence into checks before award, separating each firm’s reputation from the team proposed for your project. Then verify staffing and procurement details. Owner-fit takeaways reflect editorial judgment, not a performance ranking.
Require written staffing commitments for mission-critical delivery. These should cover leadership time allocation, decision authority, and replacement procedures. Check trade partners’ workloads and capacity, too. These commitments matter most when long-lead equipment or utility power controls the schedule.
For long-lead electrical and cooling equipment, request release deadlines, factory-test dates, shipping and storage plans, approved alternates, and responsibility for cost escalation. Ask how the team would respond to delays in utility power, transformers, or cooling equipment without weakening acceptance standards. Before award, check whether the named people, trade partners, and equipment plan match the project’s risk profile.
No single contractor is the best fit for every facility. Match the team to the work. Hyperscale campuses need repeatable delivery and large-scale coordination. Colocation projects need phased handoffs and tenant coordination. AI/high-density facilities need proven power, liquid-cooling, and controls integration.
Retrofits call for live-facility protection and outage planning. Regional jobs need local labor and a deep pool of subcontractors. Projects with tight schedules need locked-in time for commissioning and turnover. Require project-specific proof of that fit.
Before awarding the contract, verify at least three comparable projects that are complete or substantially complete. Check the contractor’s role, schedule performance, change-order history, safety record, commissioning results, and condition at turnover. Review references, baseline-versus-actual schedules, procurement plans, and change controls.
Then check the people assigned to your project. Require a staffing and retention plan covering project managers, superintendents, MEP managers, commissioning leads, and field leaders. It should name the leaders and spell out reporting lines, backup coverage, replacement procedures, and trade-partner commitments. Use it to assess whether the proposed team can carry the work through commissioning and handoff.
Bring in a data center contractor as early as possible, ideally during preconstruction and before drawings are issued [1][2][3]. Their input helps align commissioning, design, work sequencing, and procurement of long-lead equipment. Generators, switchgear, and chillers currently drive schedules more than civil work does [2][3].
For hyperscale builds, hire a construction management firm 4 to 6 months before mobilization to manage complex power interconnections, commissioning, and site-specific coordination [4].
The best model depends on your facility type and goals. Hyperscale projects commonly use Engineering, Procurement, and Construction (EPC) or design-build to standardize delivery across regions and maintain owner control. These models also bring design coordination and procurement together to speed up delivery.
Colocation projects typically favor Construction Manager at Risk (CMAR), Guaranteed Maximum Price (GMP), or negotiated general contractor agreements. These options allow flexibility for tenant-specific requirements and phased turnovers while facilities remain live.
Look for a track record of high-density, AI-ready projects that use direct-to-chip or immersion cooling [1]. Choose your cooling approach early in the design process so it matches what the contractor can deliver [1].
Ask for proof of successful MEP coordination and BIM-based clash detection to prevent conflicts between cooling lines and other critical systems [1]. Request sample Integrated Systems Testing (IST) reports from recent projects to see how the contractor checks reliability under real-world loads [1].