THE 2026 MASTER GUIDE

Arsenal-1 Explained: What Anduril Is Building in Ohio and Who It Is Hiring (Independent Guide)

An independent guide to Anduril's Arsenal-1 campus in Pickaway County, Ohio: what has been built so far, what is scheduled, what the state paid for it, and which role families the program is hiring for based on the company's public job board. Sourced from state releases, local reporting and the public board, not from any relationship with Anduril.
Hire Mission-Critical Talent
Become a Candidate
5M sq ft
Planned campus on 500 acres beside Rickenbacker International Airport, Pickaway County (source: JobsOhio, July 27 2026)
$910.5M
Capital investment commitment in the state agreement; total construction cost reported at $1.4B in the site-plan records (source: JobsOhio, July 27 2026; WCMH, Oct 18 2025)
4,008 jobs
Production and service jobs committed by end of 2035 in the state incentive agreements; the January 2025 tax-credit approval was announced as more than 4,000 (source: JobsOhio, Jul 9 2025; Ohio Statehouse News Bureau, Jan 27 2025)
557 days
From the January 16 2025 announcement to the first Ohio-built Fury rolling off the Building 1 line on July 27 2026 (source: JobsOhio, July 27 2026)

Arsenal-1 Explained: What Anduril Is Building in Ohio and Who It Is Hiring (Independent Guide)

Related Articles

01 — Methodology

How to read these numbers

Arsenal-1 is the name Anduril Industries gave to the manufacturing campus it announced on January 16 2025 for a 500-acre site next to Rickenbacker International Airport in Pickaway County, roughly 16 miles south of downtown Columbus. The mailing address is Ashville, Ohio, which is why the company’s job board lists the site as “Ashville, Ohio” rather than Columbus. This guide assembles what is publicly known about the build, the schedule, the incentives and the workforce, and then reads the company’s own public job board to show which role families the program is actually staffing as of mid-September 2026.

Three kinds of sources are used, and each number states which one it came from. Facility and schedule facts come from the Ohio Governor’s Office and JobsOhio releases, the CT Realty developer announcement, and local coverage by the Ohio Statehouse News Bureau, WCMH/NBC4 (via Yahoo syndication), Ohio Tech News, Defense News, Breaking Defense, Site Selection and the Scioto Valley Guardian. Every source cited was opened; the outlet and date sit next to each figure. Role-family counts come from Anduril’s public Greenhouse job board (boards.greenhouse.io/andurilindustries), filtered to postings that list Ashville or Columbus, Ohio, and pulled 2026-09-15. Counts are refreshed monthly from the public board.

What this guide does not do: it does not republish job descriptions, it does not report anything Anduril has not said publicly, and it does not use any placement data of our own. Wage figures are the ones the state and local press have printed from the incentive agreement, not an offer range. If a fact matters to a decision, follow the citation to the original release.

Independent guide — not affiliated with Anduril

iRecruit.co is an independent recruiting firm. We are not affiliated with Anduril and do not recruit on its behalf. Every role discussed here is posted on Anduril's own careers site; applying there is the only way to be considered for those positions. Counts below come from Anduril's public job board (Greenhouse), pulled 2026-09-15, and change daily.

02 — At a glance

The benchmarks at a glance

The whole guide in one screen. Each row jumps to the full section.

Anchor numbers: 5 million square feet planned on 500 acres, a $910.5 million committed investment, 4,008 jobs by 2035 at a projected average salary of about $132,305 once fully staffed (Dayton Daily News, Jul 9 2025), and 134 Ohio-located openings on the public board as of 2026-09-15. Everything else on this page is detail around those five figures.

03 — Benchmarks

Six build facts about Arsenal-1

Anduril has published more about Arsenal-1 than most defense primes publish about a plant, but the picture is still scattered across state releases, developer announcements and local reporting. The six cards below are the build facts that are public and checkable as of September 2026.

500 acres
Site: Pickaway County, beside Rickenbacker
The campus sits on 500 acres adjacent to Rickenbacker International Airport, chosen from more than 400 sites nationally for runway access that allows immediate flight test, multimodal logistics, water and workforce density, and proximity to Wright-Patterson AFB (source: Site Selection, Q1 2025). Site-plan records show the chosen layout clears 76 acres of trees and affects 5.6 acres of wetlands, and construction started on non-sensitive areas first (source: WCMH via Yahoo, Oct 18 2025).
5M sq ft
Scope: seven production buildings plus support
The full program is 5 million square feet; Anduril describes seven buildings and four support spaces, with a centralized hub, substation, operations facilities, roadwork and a campus amenities building phased in with demand rather than opened at once (source: WCMH/NBC4 via Yahoo, Jan 29 2026; defence-industry.eu, Jan 31 2026; Ohio Tech News, Mar 20 2026). The March 2025 developer release counted ten buildings inside a secure perimeter, so the building count has moved as the plan matured (source: CT Realty, Mar 13 2025).
775K + 924K
Phases: Building 1 live, Building 2 rising
Building 1 is 775,000 sq ft of production space with 120,000 sq ft of office and support, and it went into production in March 2026. Building 2 broke ground in summer 2025 at more than 924,000 sq ft, with walls going up and interior work starting in early 2026 (source: The Defense News, Feb 1 2026; Ohio Tech News, Mar 20 2026). The developer’s Phase 2 scope was listed as 915,000 sq ft of manufacturing plus 250,000 sq ft of showcase and office (source: CT Realty, Mar 13 2025).
CT Realty
Delivery: developer-led build-to-suit
CT Realty is the developer on a build-to-suit basis, with Anduril as tenant and investor; brokers were Hughes Marino for Anduril and JLL for CT, with Latham and Watkins and ElkinsKalt as counsel (source: CT Realty, Mar 13 2025). No general contractor or architect has been named in any public release opened for this guide, so treat GC identity as undisclosed rather than unknown.
Up to 600
Construction workforce at peak
Local reporting in March 2026 said up to 600 construction workers are expected to be part of the total campus build, while Building 1 was being fitted out and Building 2 was in vertical construction (source: Ohio Tech News, Mar 20 2026). That is the trades and construction-management labor pool the campus draws on, separate from the 143 Anduril employees on the production side (source: Ohio Tech News, Jul 28 2026).
2035
Schedule: staggered ten-year buildout
The state agreement runs the job commitment to end of 2035 and the JobsOhio grant pays over ten years with a further 20-year maintenance clawback, so the campus is planned as a decade-long staggered buildout where each building starts production before the whole site is complete (source: Dayton Daily News, Jul 9 2025; defence-industry.eu, Jan 31 2026). Anduril’s COO described the project as ahead of schedule and under budget in early 2026 (source: ClearanceJobs, Apr 2 2026).

Sources: JobsOhio, First Ohio-Built Fury Rolls Off Anduril's Arsenal-1 Production Line (Jul 27 2026); Ohio Statehouse News Bureau (Jan 27 2025); Site Selection (Q1 2025); CT Realty (Mar 13 2025); WCMH/NBC4 via Yahoo (Oct 18 2025); defence-industry.eu (Jan 31 2026); The Defense News (Feb 1 2026); Ohio Tech News (Jan 29, Mar 20 and Jul 28 2026); WCMH/NBC4 (Jan 29 and Mar 25 2026); JobsOhio (Jul 9 2025); Breaking Defense (Jan 16 2025, Mar 23 2026); Dayton Daily News via Yahoo (Jul 9 2025); ClearanceJobs (Apr 2 2026); Scioto Valley Guardian (Aug 26 2026); Anduril public Greenhouse board, pulled 2026-09-15.

Why the headline numbers move between sources

You will see $900 million, $910.5 million, $1 billion and $1.4 billion attached to the same project. They are different measures: $910.5 million is the capital commitment in the state agreement (JobsOhio, Jul 27 2026), “$1 billion” is how Anduril and national outlets rounded it at announcement (Breaking Defense, Jan 16 2025), and $1.4 billion is the construction cost figure in the environmental site-plan records (WCMH via Yahoo, Oct 18 2025). Job counts move the same way: 4,000 is the round number, 4,008 is the contractual figure, and the 4,500 to 8,500 figures are indirect and induced jobs from the state’s economic-impact modelling (Site Selection, Q1 2025; Columbus Region). This guide uses the contractual figures and labels the rest.

04 — Cost drivers

Six role families the program is hiring for

Anduril’s public Greenhouse board carried 2,313 openings company-wide on 2026-09-15, of which 134 list Ashville or Columbus, Ohio (124 Ohio-only, 10 shared with Costa Mesa, Fort Collins or other sites). Grouped by family, the Ohio postings show a factory moving from launch-team hiring into rate production and second-line stand-up. Counts are from the public board, pulled 2026-09-15.

34 reqs
Manufacturing engineering
Manufacturing, process-development, tooling, test, industrial and optimization engineers, most tagged to a product line: Fury, Roadrunner, Altius, Barracuda, Connected Warfare or Intelligence Systems (public board, pulled 2026-09-15). It is the largest family because each new line at Arsenal-1 gets its own manufacturing engineering cell before technicians are hired at volume.
26 reqs
Quality, test and metrology
Product quality engineers, quality specialists and inspectors, MRB, supplier quality, calibration and metrology, plus a quality data analyst and a quality technical program manager (public board, pulled 2026-09-15). The density reflects an aircraft and missile factory qualifying its first articles, where AS9100-style inspection and acceptance test procedures gate every delivery.
16 reqs
Production technicians and coordinators
Production and lead technicians, low-observables technicians, acceptance-test and tool-and-gauge technicians, material associates and production coordinators (public board, pulled 2026-09-15). The board count understates hourly demand because Anduril runs technician hiring through cohorts: OhioMeansJobs Pickaway is preparing to fill 110 technician roles between September and January with about 420 candidate assessments (source: Scioto Valley Guardian, Aug 26 2026).
13 reqs
Controls, facilities, construction and EHS
Controls and SCADA engineers for manufacturing automation, facilities electrical, mechanical and controls engineers, an associate facilities manager, two construction project managers and an EHS senior engineer (public board, pulled 2026-09-15). This is the owner-side construction and facilities team that carries Buildings 2 through 7 and the substation; the titles overlap directly with the construction project manager and MEP engineer profiles iRecruit screens for other employers in the same market.
11 reqs
Production and program leadership
Deputy heads of production for Altius and Fury, a director of manufacturing operations, a manufacturing operations manager and supervisor, production program managers, a production finance manager, deployment operations and a capital-projects strategy role (public board, pulled 2026-09-15). These are the roles that turn a launch team into a three-shift operation capable of the 150-aircraft annual rate Anduril has described (source: Breaking Defense, Mar 23 2026).
10 reqs
Supply chain, sourcing and materials
A director of supply chain, product sourcing engineers tagged Arsenal-1, material and senior material planners, a material flow engineer, logistics associates, a WMS systems analyst and a government property manager (public board, pulled 2026-09-15). The government-property role signals DoD contract property accountability moving on site, and the sourcing roles track Anduril’s stated push into upstream suppliers (source: ClearanceJobs, Apr 2 2026).

The remaining 24 Ohio postings split between systems and mission engineering (10, mostly C2 integration and cleared AFSIM operations analysts) and security, IT and recruiting (14, including a special security officer, MSOC manager, badging lead and seven recruiting roles). Six recruiters and a recruiting-coordinator req on a 134-req board tells you the company expects hiring volume to rise, not fall, through the winter. Only 3 of the 134 titles state an active clearance in the title; most production roles instead carry ITAR U.S.-person language in the posting body.

05 — Variation

Timeline: six milestones from announcement to rate production

The public schedule has held or beaten every date Anduril and the state announced, which is unusual for a greenfield defense plant. The milestones below are the ones with a checkable date attached.

Announcement
Jan 16 2025
Anduril and Governor DeWine announce Arsenal-1: 5M sq ft, 500 acres, 4,000+ jobs, production targeted for July 2026 (source: Defense News, Jan 16 2025; Breaking Defense, Jan 16 2025).
Incentives approved
Jan 27 2025
Ohio Tax Credit Authority approves a 2.594%, 30-year Job Creation Tax Credit valued at $452.3M against more than 4,000 jobs at a $63.61 average hourly wage (the 4,008-job and $530M-payroll commitments were formalized in the July 2025 JobsOhio agreement); $70M All Ohio Future Fund request for site readiness (source: Statehouse News Bureau, Jan 27 2025; WSYX, Jan 27 2025; JobsOhio, Jul 9 2025).
Developer and Phase 1 start
Mar 13 2025
CT Realty announced as build-to-suit developer; Phase 1 at 775,000 sq ft targeted for completion by end of 2025, Phase 2 construction to start immediately (source: CT Realty, Mar 13 2025).
First hires and Building 2 groundbreaking
Jul 2025
JobsOhio executes the $310M grant agreement on July 9; Building 2 breaks ground in summer 2025; a first cohort of 25 technical production leads trains at Anduril’s California HQ and the first 50 Ohio-based employees are on board by January 2026 (source: Dayton Daily News via Yahoo, Jul 9 2025; defence-industry.eu, Jan 31 2026; Ohio Tech News, Jan 29 2026).
Fury production starts
Mar 2026
YFQ-44A production begins in Building 1 with about 30 workers on a 22-station line, three months ahead of the July target; up to 600 construction workers still on site (source: Breaking Defense, Mar 23 2026; Ohio Tech News, Mar 20 2026).
First Ohio-built Fury
Jul 27 2026
First aircraft rolls off the line 557 days after announcement and 126 days after production start, with 143 employees on site; Roadrunner and Barracuda launch teams hiring for second and third lines by year-end (source: JobsOhio, Jul 27 2026; Ohio Tech News, Jul 28 2026; WSYX, May 12 2026).

What is not yet public: a completion date for Building 2, any schedule for Buildings 3 through 7, and the point at which the second and third shifts are added. The best available proxy is the hiring cadence: about 250 employees expected by end of 2026 (ClearanceJobs, Apr 2 2026), a 110-technician cohort running September through January (Scioto Valley Guardian, Aug 26 2026), and a public board that added recruiter and production-leadership reqs ahead of technician reqs.

06 — Trend

Context: why Pickaway County, and what the state bought

Anduril says it screened more than 400 sites and chose Rickenbacker for a specific combination: a main runway next door so aircraft can be flight-tested where they are built, an air-cargo and rail logistics hub, water and power capacity, a two-to-four-year technical education pipeline, and proximity to Wright-Patterson AFB and its Springfield test site (source: Site Selection, Q1 2025). The region also carries a defense manufacturing history that local officials lean on, with Curtiss-Wright having built more than 3,500 naval aircraft in Columbus during World War II (source: Columbus Region).

The incentive package is the largest job-creation deal in Ohio history by employment and payroll. The 2.594% refundable Job Creation Tax Credit runs 2026 to 2055 and is worth an estimated $452.3 million if the more than 4,000 jobs and the roughly $63.61-per-hour average wage are delivered; for comparison, Intel received a 3.99% rate in 2022 for fewer direct jobs (source: Statehouse News Bureau, Jan 27 2025). JobsOhio added a $310 million grant paid over ten years, with commitments that must be maintained for a further 20 years, and Pickaway County sought $70 million from the All Ohio Future Fund for site readiness (source: Dayton Daily News via Yahoo, Jul 9 2025; WSYX, Jan 27 2025). State officials have said publicly that the money is contingent on the company delivering.

Supply chain is the other reason the plant looks the way it does. Anduril states that roughly 90% of its products can be made from commercially available components, and it is investing upstream in suppliers, including mines and refineries, to reduce exposure to defense-only sources (source: ClearanceJobs, Apr 2 2026). On the floor that translates into aluminum airframes rather than titanium, few castings and forgings, and minimal fixed automation in the early phases, all of which lower the skill floor for hourly hires and raise the premium on manufacturing and quality engineers who can design the process (source: Breaking Defense, Mar 23 2026). Energetics stay elsewhere: solid rocket motors are made in Mississippi and munitions are integrated separately (source: Breaking Defense, Jan 16 2025).

07 — Workforce

What Arsenal-1 means for the central Ohio labor market

Arsenal-1 is arriving in a market that was already tight. Pickaway County unemployment was 3.5% in June 2026 against 3.7% statewide (source: Scioto Valley Guardian, Aug 26 2026), and the same commuting shed is feeding Intel’s Ohio One campus, the Honda-LG battery plant, Rickenbacker logistics and several hyperscale data center builds. The families Anduril is hiring, manufacturing engineers, quality engineers, controls and SCADA engineers, facilities and construction project managers, are the same titles those programs post. Anduril’s stated answer is to hire from commercial aviation and automotive, train technicians from Pickaway County’s four high schools and area colleges, and route hourly cohorts through OhioMeansJobs (source: ClearanceJobs, Apr 2 2026; WCMH/NBC4, Mar 25 2026; Scioto Valley Guardian, Aug 26 2026). Employers competing for the same people should expect the 34 manufacturing-engineering and 26 quality reqs on the board to set the local price for those skills for the next two years.

Where iRecruit fits, stated plainly: we do not recruit for Anduril and none of these roles come through us. What we are doing is building candidate density in the role families this build-out is pulling on, project engineers through executive leadership across aerospace and defense manufacturing, industrial construction and controls, for the employers in the same market who do work with us. If you are a general contractor, subcontractor, supplier or neighboring manufacturer staffing against this demand, the facilities manager and construction PM salary guides on this site give the BLS-anchored benchmarks; this page gives the demand picture.

For the hiring side of this market, see the Aerospace & Defense Manufacturing practice.

08 — FAQ

Frequently asked questions

Is iRecruit affiliated with Anduril or Arsenal-1?+
No. iRecruit.co is an independent recruiting firm with no affiliation with Anduril Industries and no role in hiring for Arsenal-1. Every position discussed here is posted on Anduril’s own careers site, and applying there is the only way to be considered. This guide is compiled from public releases, local reporting and the public job board.
Where exactly is Arsenal-1 and why do postings say Ashville, Ohio?+
The campus is on 500 acres adjacent to Rickenbacker International Airport in Pickaway County, about 16 miles from downtown Columbus (source: Site Selection, Feb 13 2025). The site’s postal address is Ashville, so Anduril’s job board lists Ohio roles as Ashville rather than Columbus.
How many people work at Arsenal-1 now, and how many will it employ?+
As of July 27 2026 there were 143 technicians, engineers and specialists on site, with roughly 250 expected by end of 2026 (source: Ohio Tech News, Jul 28 2026; ClearanceJobs, Apr 2 2026). The state agreement commits Anduril to 4,008 jobs by the end of 2035 at a projected average salary of about $132,305 when fully staffed (source: Dayton Daily News via Yahoo, Jul 9 2025).
What is built at Arsenal-1?+
The first program is the YFQ-44A Fury collaborative combat aircraft, with capacity of up to 150 a year on three shifts; Roadrunner and Barracuda lines and one classified program are due by end of 2026 (source: Breaking Defense, Mar 23 2026; WSYX, May 12 2026). Solid rocket motors and munitions are made elsewhere (source: Breaking Defense, Jan 16 2025).
Do Arsenal-1 roles require a security clearance?+
Only 3 of 134 Ohio-located titles on the public board state an active clearance in the title, and those are mission-engineering analyst roles shared with Costa Mesa (public board, pulled 2026-09-15). Most production, quality and facilities postings instead carry ITAR U.S.-person eligibility language, and a contractor special security officer and MSOC manager req indicate cleared facility operations are being stood up on site.
Talent network, not an application

Join iRecruit’s talent network for similar roles at defense-tech and advanced-manufacturing employers we do work with. This is not an application to Anduril. iRecruit is assembling its network of manufacturing, quality, controls and construction talent, project engineer through executive, ahead of demand across the central Ohio and national reindustrialization build-out.